Clarksville Tire Plant Expansion — Clarksville, TN
2.2M SF Phase II expansion — 536,700 CY of dirt moved, with self-performed utilities and stabilization.
View project →Kuesel is a St. Louis water and sewer contractor for commercial and industrial sites.
Need the full underground package on one crew? See our site utility contractor page.

Supporting credentials: MSD (Metropolitan Sewer District) vendor · PWSD prequalified contractor
On commercial and industrial sites, our utility crews install the private-side pipe that developers and general contractors need before a building can open: domestic water and fire lines to the building, sanitary services, site storm sewer, structures, and the tie-ins to detention and retention basins.
We run pipe from tap to structure with crews certified in both Missouri and Illinois.
As an underground utility contractor, we schedule this pipe work alongside our own grading, so the utility crew isn't waiting on another sub to bring the site to grade.
When the job covers the whole lot — clearing, grading, utilities and paving prep — see how we work as a site work contractor in St. Louis.
Utility work is built to the standards named in the project specifications, including:
Water mains, valves, hydrants, domestic services and fire lines from the main to the building, built to the standards of the water provider that will own the main. Each new main is pressure tested, flushed and disinfected before it goes into service.
Gravity sanitary mains, manholes and building laterals, deep sewer where grades require it, and force mains and lift stations. Lines are tested to the sewer owner's specifications before acceptance.
Storm pipe, inlets, junction boxes, headwalls and outlet structures, tied into detention, underground detention and bioretention. In St. Louis City and most of St. Louis County, that work is reviewed by MSD.
2.2M SF Phase II expansion — 536,700 CY of dirt moved, with self-performed utilities and stabilization.
View project →Full site development for a data center campus: mass grading, more than 3,600 LF of storm with three bio-retention ponds, 30" PE sanitary sewer and an 8" C900 water main.
View project →Sanitary and water relocations for an interstate widening in Columbia: utilities hydro-excavated first, 745 LF of 8" sanitary relocated, and about 400 LF of water main moved with a live tie-in.
View project →Sanitary main for a build-to-rent single-family community in Wentzville: about 1,700 LF of 12" PVC upsized from 10", with a 526 LF segment lowered and converted to C900.
View project →





See how this scope plugs into the verticals we serve across St. Louis, Missouri, and Illinois:
Browse the full Who We Serve page for every market Kuesel partners with.
See every city on the service area page.