In Alton, IL
Retail Pavement Cement Stabilization
Kuesel stabilized 4,293 SY of retail pavement subgrade 12 inches deep with Portland cement at 7%, exported 250 CY and restored subgrade to ±0.10'.
View project →Alton is a river town built up the Mississippi bluffs. Projects there tend to be older developed sites being reworked rather than new ground.
Bluff sites mean slopes, limestone close to the surface, and runoff that needs controlling. Older parts of town often have aging underground infrastructure, including combined storm and sanitary lines, that new projects have to work around or replace.
Alton: Kuesel stabilized 4,293 SY of retail pavement subgrade 12 inches deep with Portland cement at 7%, exported 250 CY and restored subgrade to ±0.10'.
In Alton, IL
Kuesel stabilized 4,293 SY of retail pavement subgrade 12 inches deep with Portland cement at 7%, exported 250 CY and restored subgrade to ±0.10'.
View project →Near Alton — Berkeley, MO
Equipment yard and building in Berkeley: subgrade stabilized with 10" of Portland cement under a millings surface, more than 2,500 LF of storm and 2,440 CY of bio-retention.
View project →| County | Madison County |
|---|---|
| Distance from HQ | About 29 miles east of O'Fallon, MO (straight line) |
| State | Illinois |