Near Florissant — Berkeley, MO
Commercial Equipment Yard
Equipment yard and building in Berkeley: subgrade stabilized with 10" of Portland cement under a millings surface, more than 2,500 LF of storm and 2,440 CY of bio-retention.
View project →Much of the work in Florissant is on ground that has been built on before. We take on North County redevelopment for owners and general contractors who need an old site cleared and rebuilt.
Redevelopment sites bring old foundations, abandoned utilities, and pavement that has to come out before new grading starts. Older sanitary and storm lines often need replacement or relocation to serve the new layout.
Berkeley provides nearby project evidence for Florissant, not a claim of work inside Florissant. Equipment yard and building in Berkeley: subgrade stabilized with 10" of Portland cement under a millings surface, more than 2,500 LF of storm and 2,440 CY of bio-retention.
Near Florissant — Berkeley, MO
Equipment yard and building in Berkeley: subgrade stabilized with 10" of Portland cement under a millings surface, more than 2,500 LF of storm and 2,440 CY of bio-retention.
View project →Near Florissant — Maryland Heights, MO
Site prep for a lab building addition in Maryland Heights: existing utilities located by hydro excavation before digging, then removals, grading, subgrade and new storm.
View project →Near Florissant — Alton, IL
Kuesel stabilized 4,293 SY of retail pavement subgrade 12 inches deep with Portland cement at 7%, exported 250 CY and restored subgrade to ±0.10'.
View project →Near Florissant — St. Louis, MO
Urban infill in the City of St. Louis: houses and foundations demolished, about 4,000 CY exported, and new storm, bio-retention, sanitary and a 6" water tap, permitted through MSD.
View project →| County | St. Louis County |
|---|---|
| Distance from HQ | About 21 miles east of O'Fallon, MO (straight line) |
| State | Missouri |
| Sewer district | Metropolitan St. Louis Sewer District (MSD) |