Near Hazelwood — Berkeley, MO
Commercial Equipment Yard
Yard drainage included 2,554 LF of storm, 2,440 CY of bio-retention and rock outlet protection, with sanitary and water service also installed.
View project →MSD is the sewer district listed for Hazelwood, and older North County industrial lots often have abandoned or undocumented lines in the way. We pothole those before trenching, then install and test the new service before backfill.
Local context: Hazelwood industrial sites tie new utilities into existing North County industrial lines.
Get a Hazelwood Bid






Berkeley provides nearby project evidence for Hazelwood, not a claim of work inside Hazelwood. Yard drainage included 2,554 LF of storm, 2,440 CY of bio-retention and rock outlet protection, with sanitary and water service also installed.
Near Hazelwood — Berkeley, MO
Yard drainage included 2,554 LF of storm, 2,440 CY of bio-retention and rock outlet protection, with sanitary and water service also installed.
View project →Near Hazelwood — Maryland Heights, MO
After exposing existing utilities, Kuesel installed 105 LF of storm along with an inlet, yard drain and trench drain for the lab addition.
View project →Near Hazelwood — Town and Country, MO
The school parking lot received 372 LF of storm and a 219 CY bio-retention cell, with existing manholes tapped or adjusted under MSD permits.
View project →Near Hazelwood — Alton, IL
Kuesel stabilized 4,293 SY of retail pavement subgrade 12 inches deep with Portland cement at 7%, exported 250 CY and restored subgrade to ±0.10'. The record does not document water sewer work.
View project →Sites near the airport often have height and construction-activity limits to plan around, along with existing industrial utilities. Redeveloped parcels may also carry old pavement and foundations that come out before grading.
All Kuesel services in Hazelwood →