In Fenton, MO
Freight Terminal Expansion
Complete site package for a freight terminal building addition in Fenton: a structural-fill pad, more than 2,400 LF of storm sewer, two underground detention systems and a new water main.
View project →Fenton's industrial ground along I-44 and Highway 141 is where Kuesel built the site package for a freight terminal building expansion. We bring that same pad, storm and water work to other industrial and logistics owners in the corridor.
Industrial lots in Fenton are often already built on, so expansions start by removing pavement and old storm structures before a new pad goes in. Larger buildings and truck areas also mean storm systems with detention, which on tighter sites goes underground.
Fenton: Complete site package for a freight terminal building addition in Fenton: a structural-fill pad, more than 2,400 LF of storm sewer, two underground detention systems and a new water main.
In Fenton, MO
Complete site package for a freight terminal building addition in Fenton: a structural-fill pad, more than 2,400 LF of storm sewer, two underground detention systems and a new water main.
View project →Near Fenton — Crestwood, MO
Site development for a new convenience store and fuel station in Crestwood: about 1,300 LF of storm, two hydrodynamic separators and a roughly 14,000 CF underground detention system.
View project →Near Fenton — Town and Country, MO
New athletic-field parking lot at a private school in Town and Country: old structures abandoned, lot graded to ±0.10', 372 LF of storm and a 219 CY bio-retention cell.
View project →Near Fenton — Chesterfield, MO
Kuesel widened the levee about 10 feet, raised it with fill and graded the Phase 6 levee trail.
View project →| County | St. Louis County |
|---|---|
| Distance from HQ | About 24 miles southeast of O'Fallon, MO (straight line) |
| State | Missouri |
| Sewer district | Metropolitan St. Louis Sewer District (MSD) |