Full-Depth Reclamation (FDR)
When asphalt has failed down to the base, an overlay won't hold. Full-depth reclamation pulverizes the existing pavement and the base beneath it, blends in a stabilizing agent set by the mix design, and compacts it into a new, uniform base — recycled in place instead of hauled off.
Get a Bid
Rebuild the base without hauling it away.
Full-depth reclamation (FDR) recycles a failed asphalt pavement in place. The old asphalt and the base beneath it are pulverized together, blended with a stabilizing agent, and compacted into a new, uniform base that is then surfaced. The existing material stays on site instead of going to a landfill, and new aggregate does not have to be trucked in.
FDR is used when asphalt on parking lots and roads has failed through the base — widespread cracking, rutting, and potholes that an overlay would only cover up. The agent, rate, and depth come from the engineer of record and the lab mix design.
How an FDR job runs.
- 01Review the pavement, plans, and the engineer's mix design
- 02Pulverize the existing asphalt and base to the specified depth
- 03Spread the stabilizing agent at the rate set by the mix design
- 04Mix the reclaimed material to a uniform blend
- 05Grade and compact the new base
- 06QC testing by the owner's testing agency, then pave
ARRA and PRRC
Kuesel is involved with the Asphalt Recycling and Reclaiming Association (ARRA) and the Pavement Recycling and Reclaiming Center Founders Circle, along with 5 other industry organizations listed on our company facts page.
Invite Us to BidKuesel's soil stabilization and FDR division also operates as St. Louis Soil Stabilization.
Capabilities under this service line
- Pulverizing failed asphalt and base in place
- Stabilizing agent applied per the mix design
- Mixing to the specified depth
- Grading and compaction of the reclaimed base
- Parking lots, roads, and municipal streets
Full-Depth Reclamation (FDR) in action



- 01Failed asphalt and base recycled in place instead of hauled off
- 02Stabilizing agent applied at the rate set by the mix design
- 03Same in-house crews that perform our lime and cement stabilization
Full-Depth Reclamation (FDR) for the owners and GCs that hire Kuesel
See how this scope plugs into the verticals we serve across St. Louis, Missouri, and Illinois:
Browse the full Who We Serve page for every market Kuesel partners with.