Full Depth Reclamation Contractors — St. Louis & Missouri

Full depth reclamation (FDR) rebuilds failed asphalt in place: the old pavement and base are pulverized, stabilized and compacted into a new base, then paved. As full depth reclamation contractors, Kuesel does this work on private parking lots, drives, industrial yards and commercial site pavements for developers, general contractors and commercial property owners across St. Louis and Missouri.

Get a Bid
Full-Depth Reclamation (FDR) — Full-depth reclamation of failed asphalt parking lots, private drives and industrial yards — pulverize, stabilize, and rebuild the base in place.
What FDR is

Rebuild the base without hauling it away.

Full-depth reclamation (FDR) recycles a failed asphalt pavement in place. The old asphalt and the base beneath it are pulverized together, blended with a stabilizing agent, and compacted into a new, uniform base that is then surfaced. The existing material stays on site instead of going to a landfill, and new aggregate does not have to be trucked in.

FDR is used when asphalt on parking lots, private drives, industrial yards and other commercial site pavements has failed through the base — widespread cracking, rutting, and potholes that an overlay would only cover up. The agent, rate, and depth come from the engineer of record and the lab mix design.

General process

How an FDR job runs.

  1. 01Review the pavement, plans, and the engineer's mix design
  2. 02Pulverize the existing asphalt and base to the specified depth
  3. 03Spread the stabilizing agent at the rate set by the mix design
  4. 04Mix the reclaimed material to a uniform blend
  5. 05Grade and compact the new base
  6. 06QC testing by the owner's testing agency, then pave
Choosing a fix

FDR vs. mill-and-overlay vs. reconstruction.

Full depth reclamationMill and overlayFull reconstruction
What it fixesFailed pavement and the base under itSurface wear on a sound baseFailed pavement and base
Existing materialRecycled in place into a new baseTop layer milled; base staysRemoved and hauled off
Base strengthRebuilt and stabilizedUnchangedRebuilt with new material
TruckingMostly stabilizing agent deliveriesMillings out, asphalt inSpoils out, base and asphalt in
Who uses FDR

Built for private pavement.

Our FDR work is aimed at private lots, for developers, general contractors and property owners. For how to tell when a lot is ready for it, read when to recycle pavement with full-depth reclamation. We reclaim failed pavement for:

  • Commercial property owners and their parking lots
  • Industrial and logistics sites — drives, truck courts and yards
  • Developers and GCs rebuilding existing site pavement
  • HOAs with failing private streets and drives
Industry ties

Recycling and reclaiming groups.

Kuesel is involved with the pavement recycling industry through:

  • Asphalt Recycling and Reclaiming Association (ARRA)
  • Pavement Preservation and Recycling Alliance (PPRA)
  • National Road Research Alliance (NRRA)
  • Pavement Recycling and Reclaiming Center Founders Circle
FAQ

Full depth reclamation questions.

What is full depth reclamation?
Full depth reclamation pulverizes the existing asphalt and the base under it, stabilizes that material with cement, lime, or emulsion, and compacts it into a new base. A new surface is then paved on top.
How deep does FDR go?
FDR goes through the full thickness of the existing asphalt and into the base beneath it. The exact reclamation depth is set by the pavement design from the engineer's evaluation of the existing pavement and soils, not by a single standard number.
What is the difference between FDR and mill and overlay?
Mill and overlay removes and replaces only the top layer of asphalt, so it suits surface wear on a sound base. FDR rebuilds the base itself, so it suits pavement that has failed down to the base, where an overlay would crack through again.
Is FDR cheaper than reconstruction?
Often, because FDR recycles the existing pavement and base in place instead of excavating it, hauling it off and importing new base material. Whether it is the lower-cost option on a given lot depends on the pavement condition, soils and design, so we price it against the alternatives for your site.
What stabilizer is used in FDR?
FDR is typically stabilized with cement, lime or an asphalt emulsion. The stabilizing agent and application rate come from the mix design set by the engineer or testing lab for the materials on your site, and our crews blend to that design.
How long after FDR can you pave?
It depends on the stabilizer, the mix design and the weather. The base has to be compacted and meet the project's testing requirements before paving; the engineer and testing agency set when it is ready.
Request a Bid
Where we work

Full depth reclamation across the region.

What's Included

Capabilities under this service line

  • Pulverizing failed asphalt and base in place
  • Stabilizing agent applied per the mix design
  • Mixing to the specified depth
  • Grading and compaction of the reclaimed base
  • Parking lots, private drives, industrial yards, and commercial site pavements
On the Job

Full-Depth Reclamation (FDR) in action

Wirtgen reclaimer performing full-depth reclamation
Water truck supporting full-depth reclamation operations
Spreader trucks applying stabilizing agent ahead of the reclaimer
Kuesel spreader trucks and reclaimer on a soil stabilization project
Stabilized roadway subgrade beside an unstabilized section
Reclaimer mixing stabilized subgrade
Why Kuesel

Three reasons
not the other guys.

Talk to Preconstruction
  • 01Failed asphalt and base recycled in place instead of hauled off
  • 02Stabilizing agent applied at the rate set by the mix design
  • 03Same in-house crews that perform our lime and cement stabilization
Since 1963
Self-performing
Operating Engineers Local 513 · Laborers Locals 110/42/660 · Teamsters · Plumbers & Pipefitters UA Local 562
Union signatory
6 self-perform
Service lines under one roof
St. Louis & Surrounding Areas
Licensed
300+ pieces
Late-model fleet
1 business day
Bid response
Who We Build This For

Full-Depth Reclamation (FDR) for the owners and GCs that hire Kuesel

See how this scope plugs into the verticals we serve across St. Louis, Missouri, and Illinois:

Browse the full Who We Serve page for every market Kuesel partners with.

Call (636) 978-3478