Full depth reclamation (FDR) rebuilds failed asphalt in place: the old pavement and base are pulverized, stabilized and compacted into a new base, then paved. As full depth reclamation contractors, Kuesel does this work on private parking lots, drives, industrial yards and commercial site pavements for developers, general contractors and commercial property owners across St. Louis and Missouri.
Get a Bid
Rebuild the base without hauling it away.
Full-depth reclamation (FDR) recycles a failed asphalt pavement in place. The old asphalt and the base beneath it are pulverized together, blended with a stabilizing agent, and compacted into a new, uniform base that is then surfaced. The existing material stays on site instead of going to a landfill, and new aggregate does not have to be trucked in.
FDR is used when asphalt on parking lots, private drives, industrial yards and other commercial site pavements has failed through the base — widespread cracking, rutting, and potholes that an overlay would only cover up. The agent, rate, and depth come from the engineer of record and the lab mix design.
How an FDR job runs.
- 01Review the pavement, plans, and the engineer's mix design
- 02Pulverize the existing asphalt and base to the specified depth
- 03Spread the stabilizing agent at the rate set by the mix design
- 04Mix the reclaimed material to a uniform blend
- 05Grade and compact the new base
- 06QC testing by the owner's testing agency, then pave
FDR vs. mill-and-overlay vs. reconstruction.
| Full depth reclamation | Mill and overlay | Full reconstruction | |
|---|---|---|---|
| What it fixes | Failed pavement and the base under it | Surface wear on a sound base | Failed pavement and base |
| Existing material | Recycled in place into a new base | Top layer milled; base stays | Removed and hauled off |
| Base strength | Rebuilt and stabilized | Unchanged | Rebuilt with new material |
| Trucking | Mostly stabilizing agent deliveries | Millings out, asphalt in | Spoils out, base and asphalt in |
Built for private pavement.
Our FDR work is aimed at private lots, for developers, general contractors and property owners. For how to tell when a lot is ready for it, read when to recycle pavement with full-depth reclamation. We reclaim failed pavement for:
- Commercial property owners and their parking lots
- Industrial and logistics sites — drives, truck courts and yards
- Developers and GCs rebuilding existing site pavement
- HOAs with failing private streets and drives
Recycling and reclaiming groups.
Kuesel is involved with the pavement recycling industry through:
- Asphalt Recycling and Reclaiming Association (ARRA)
- Pavement Preservation and Recycling Alliance (PPRA)
- National Road Research Alliance (NRRA)
- Pavement Recycling and Reclaiming Center Founders Circle
Full depth reclamation questions.
- What is full depth reclamation?
- Full depth reclamation pulverizes the existing asphalt and the base under it, stabilizes that material with cement, lime, or emulsion, and compacts it into a new base. A new surface is then paved on top.
- How deep does FDR go?
- FDR goes through the full thickness of the existing asphalt and into the base beneath it. The exact reclamation depth is set by the pavement design from the engineer's evaluation of the existing pavement and soils, not by a single standard number.
- What is the difference between FDR and mill and overlay?
- Mill and overlay removes and replaces only the top layer of asphalt, so it suits surface wear on a sound base. FDR rebuilds the base itself, so it suits pavement that has failed down to the base, where an overlay would crack through again.
- Is FDR cheaper than reconstruction?
- Often, because FDR recycles the existing pavement and base in place instead of excavating it, hauling it off and importing new base material. Whether it is the lower-cost option on a given lot depends on the pavement condition, soils and design, so we price it against the alternatives for your site.
- What stabilizer is used in FDR?
- FDR is typically stabilized with cement, lime or an asphalt emulsion. The stabilizing agent and application rate come from the mix design set by the engineer or testing lab for the materials on your site, and our crews blend to that design.
- How long after FDR can you pave?
- It depends on the stabilizer, the mix design and the weather. The base has to be compacted and meet the project's testing requirements before paving; the engineer and testing agency set when it is ready.
Full depth reclamation across the region.
St. Louis County
- Full depth reclamation in Florissant, MO
- Full depth reclamation in Chesterfield, MO
- Full depth reclamation in Wildwood, MO
- Full depth reclamation in Ballwin, MO
- Full depth reclamation in Maryland Heights, MO
- Full depth reclamation in Hazelwood, MO
- Full depth reclamation in Creve Coeur, MO
- Full depth reclamation in Manchester, MO
- Full depth reclamation in Clayton, MO
- Full depth reclamation in Fenton, MO
- Full depth reclamation in Berkeley, MO
- Full depth reclamation in Crestwood, MO
- Full depth reclamation in Town and Country, MO
St. Charles County
- Full depth reclamation in O'Fallon, MO
- Full depth reclamation in St. Charles, MO
- Full depth reclamation in St. Peters, MO
- Full depth reclamation in Wentzville, MO
- Full depth reclamation in Lake Saint Louis, MO
- Full depth reclamation in Dardenne Prairie, MO
- Full depth reclamation in Cottleville, MO
- Full depth reclamation in Weldon Spring, MO
- Full depth reclamation in New Melle, MO
- Full depth reclamation in Foristell, MO
- Full depth reclamation in Augusta, MO
City of St. Louis
Metro East Illinois
- Full depth reclamation in Belleville, IL
- Full depth reclamation in O'Fallon, IL
- Full depth reclamation in Granite City, IL
- Full depth reclamation in Edwardsville, IL
- Full depth reclamation in Alton, IL
- Full depth reclamation in Collinsville, IL
- Full depth reclamation in Godfrey, IL
- Full depth reclamation in Cahokia Heights, IL
Jefferson, Lincoln & Boone Counties
Read before you build.
Capabilities under this service line
- Pulverizing failed asphalt and base in place
- Stabilizing agent applied per the mix design
- Mixing to the specified depth
- Grading and compaction of the reclaimed base
- Parking lots, private drives, industrial yards, and commercial site pavements
Full-Depth Reclamation (FDR) in action






- 01Failed asphalt and base recycled in place instead of hauled off
- 02Stabilizing agent applied at the rate set by the mix design
- 03Same in-house crews that perform our lime and cement stabilization
Full-Depth Reclamation (FDR) for the owners and GCs that hire Kuesel
See how this scope plugs into the verticals we serve across St. Louis, Missouri, and Illinois:
Browse the full Who We Serve page for every market Kuesel partners with.