Clarksville Tire Plant Expansion — Clarksville, TN
2.2M SF Phase II expansion — 536,700 CY of dirt moved, with self-performed utilities and stabilization.
View project →From mass grading to utility stub-out, we self-perform the heavy civil scope that gets industrial and mission-critical sites pad-ready. Large-scale earthwork, wet and dry utilities, and stormwater management — built on schedules that don't wait.
Our primary service area is the St. Louis region; for large data center and mission-critical projects of roughly $20M and up, Kuesel also travels (e.g. to Indiana, Kentucky, Tennessee, Iowa, Arkansas, Kansas and Ohio). Read what mission-critical pads demand from site work, or see our utility trenching and duct bank installation.
Get a Bid
2.2M SF Phase II expansion — 536,700 CY of dirt moved, with self-performed utilities and stabilization.
View project →Full site development for a data center campus: mass grading, more than 3,600 LF of storm with three bio-retention ponds, 30" PE sanitary sewer and an 8" C900 water main.
View project →Complete site package for a freight terminal building addition in Fenton: a structural-fill pad, more than 2,400 LF of storm sewer, two underground detention systems and a new water main.
View project →Our primary service area is the St. Louis region. For large data center and mission-critical projects, Kuesel also travels, for example to Indiana, Kentucky, Tennessee, Iowa, Arkansas, Kansas and Ohio.






See how this scope plugs into the verticals we serve across St. Louis, Missouri, and Illinois:
Browse the full Who We Serve page for every market Kuesel partners with.
See every city on the service area page.
Yes. Kuesel self-performs mass grading, building pads, site utilities and soil stabilization for data center and mission-critical sites. We work from O'Fallon, MO, across the St. Louis region. In St. Louis County we mass graded a data center campus and set building and pavement subgrade to ±0.10'.
Our largest project to date is the Clarksville tire plant Phase II in Clarksville, TN. It was a 2.2 million SF expansion, and we moved 536,700 CY of dirt, including deep pit excavation inside the building pad.
Yes, for large projects. Our primary area is the St. Louis region, Missouri side first, plus the Illinois Metro East. For large data center and mission-critical work we also travel, for example to Indiana, Kentucky, Tennessee, Iowa, Arkansas, Kansas and Ohio. The Clarksville, TN plant expansion is one example.
We stabilize the subgrade in place with lime or cement, spread dust-free from our own spreader trucks. On the Clarksville Phase II pad, crews lime-stabilized the building pad 16" deep at 5%, and pavements and rail 12" deep at 4%.
Yes. On the St. Louis County data center campus we built 3,680 LF of storm, three bio-retention ponds, 30" PE sanitary sewer and an 8" C900 water main with hydrants, gate valves and a PIV for the building fire line.