In O'Fallon, MO
Industrial Yard Improvements
Kuesel installed 85 LF of 12-inch RCP storm, relocated a flared end and tied into the existing drainage, with riprap and rock check dams.
View project →O'Fallon subdivisions and commercial pads usually need storm, sanitary and water laid out together so pipe goes in before the grading crew finishes streets and pads. Subdivision mains and laterals then go in ahead of streets. Nearby, Logistics Sitework in St. Peters included wet utilities.
Local context: Subdivision and pad utilities in O'Fallon go in ahead of paving, so we sequence pipe with the grading crew.
Get a O'Fallon Bid






O'Fallon: Kuesel installed 85 LF of 12-inch RCP storm, relocated a flared end and tied into the existing drainage, with riprap and rock check dams.
In O'Fallon, MO
Kuesel installed 85 LF of 12-inch RCP storm, relocated a flared end and tied into the existing drainage, with riprap and rock check dams.
View project →Near O'Fallon — St. Peters, MO
The addition's drainage included 743 LF of storm pipe and 357 LF of perforated French drain while the plant stayed in operation.
View project →Near O'Fallon — St. Peters, MO
Kuesel replaced 16 LF of 10-inch ductile iron fire main and reconnected it, then restored the concrete floor and sidewalk opened to reach the line.
View project →
Near O'Fallon — St. Peters, MO
Wet utilities were installed as part of the greenfield logistics site's mass earthwork and grading package.
View project →O'Fallon growth has been a mix of commercial pads along the main corridors and residential subdivision ground sold to builders. Both start with balancing cut and fill across the site and getting storm and sanitary lines in before streets and pads are finished.
All Kuesel services in O'Fallon →