Resources

Resources for developers, GCs & engineers.

Plain guides from the field side of sitework: what to check before you buy, what moves a site budget, and how to handle rock, soft soils and stormwater. No sales pitch, no made-up numbers.

For Developers

Budget, due diligence and design decisions before a GC is picked.

PageEarly Site Budget for DevelopersSend a survey, concept plan and geotech; get a preliminary sitework budget and risk read in 5 business days.Open GuideSite Due-Diligence Checklist for DevelopersPrintable checklist of the site questions to answer before you close on land or lock a pro forma.Open GuideWhat Drives Site Development Cost in St. LouisThe conditions and decisions that move a sitework budget, and when you can still change them.Open GuideCommercial Site Prep Sequence: From Clearing to Pad Hand-OffThe usual order of commercial site prep work and a coordination checklist for GCs and owners.Open GuideSoil Stabilization Cost FactorsThe qualitative drivers behind a stabilization price and how to compare it fairly with undercut.Open GuideStabilizing Building Pads and Paving Subgrade on St. Louis ClayWhy local clays and loess fail, how pad and pavement goals differ, and a checklist for GCs and developers.Open GuideBalancing Cut and Fill to Cut Export CostsHow pad elevations, grading and stabilization change how much dirt leaves or arrives on trucks.Open GuideStormwater and Detention: What St. Louis-Area Developers Should Plan ForWho reviews stormwater where, detention and bioretention options, and land disturbance permits.Open GuideConstruction BMPs: Erosion and Sediment Control BasicsCommon construction BMPs, inspections after rain, and SWPPP basics.Open GuideMSD's 2027 Rules: What Changes for St. Louis Site DevelopmentYour submittal date decides your rulebook: the 2027 stormwater, sanitary and strapped plumbing changes, side by side with 2018.Open GuideRedeveloping a St. Louis Site Under MSD's 2027 Rules: Existing Pavement, Cumulative Disturbance and AdditionsHow MSD's 2027 draft rules treat redevelopment: when existing pavement gets no credit, cumulative disturbance since 2006, additions to old basins, and exemptions.Open GuideBuilding Near a Floodplain Under MSD's 2027 Rules: Studies, Elevations and ParkingWhat MSD's 2027 draft changes for floodplain sites: simplified vs. detailed studies, FEMA draft data, floor and sill elevations, parking and culverts.Open GuideStorm Sewer and Inlet Design Under MSD's 2027 Rules: What Changes in the FieldMSD's 2027 draft storm sewer changes: continuity with existing systems, sag inlets, 4 cfs inlet rule, slope outfalls and manhole spacing, from a site contractor.Open GuideDetention Basins and BMPs Under MSD's 2027 Rules: Build Details, Reports and Getting Your Deposit BackMSD's 2027 draft basin and BMP details: outlet structures, trash racks, liners, vegetation, as-builts, the BMP hand-off meeting and deposit release.Open PageSt. Louis Site Work Unit PricesWhat public bids say local excavation, pipe and paving items cost.Open
For General Contractors

Bringing a site sub in early, pricing risk, and sending us a bid package.

GuideWhy Bring Your Site Contractor In EarlyWhat a site contractor adds during design: value engineering, budget certainty, schedule and alternates.Open GuideCommercial Site Prep Sequence: From Clearing to Pad Hand-OffThe usual order of commercial site prep work and a coordination checklist for GCs and owners.Open GuideMSD Utility Work: How Permitted Sewer and Storm Work Generally FlowsThe general flow of MSD-permitted sanitary and storm work: approval, permits, inspections and as-builts.Open GuideConstruction BMPs: Erosion and Sediment Control BasicsCommon construction BMPs, inspections after rain, and SWPPP basics.Open GuideRock and Poor Soils on St. Louis Sites: How to Price the RiskUnit prices, test pits, geotech scope, and stabilization alternates for the ground you can't see.Open GuideWhat Drives Site Development Cost in St. LouisThe conditions and decisions that move a sitework budget, and when you can still change them.Open GuideStabilizing Building Pads and Paving Subgrade on St. Louis ClayWhy local clays and loess fail, how pad and pavement goals differ, and a checklist for GCs and developers.Open PagePrequalification & SafetyCompany, union, scope and service-area facts for GC and owner prequalification.Open PageRequest a BidSend plans, specs and geotech. We confirm within 1 business day.Open PageService AreaCities and counties we work in across Missouri and the Illinois Metro East.Open PageFAQStraight answers about Kuesel, our crews, and how we bid.Open PageSt. Louis Site Work Unit PricesWhat public bids say local excavation, pipe and paving items cost.Open PageBlogField notes on earthwork, stabilization, utilities and permitting.Open
For Engineers & Owners

Subgrade options, poor soils, and stormwater features.

GuideLime vs. Cement vs. UndercutPlain-English comparison of subgrade fixes in Missouri, with a checklist for engineers.Open GuideCement-Modified Soil vs. Cement-Treated BaseHow cement-modified soil and cement-treated base differ in purpose, design and testing.Open GuideStabilizing Building Pads and Paving Subgrade on St. Louis ClayWhy local clays and loess fail, how pad and pavement goals differ, and a checklist for GCs and developers.Open GuideRock and Poor Soils on St. Louis Sites: How to Price the RiskUnit prices, test pits, geotech scope, and stabilization alternates for the ground you can't see.Open GuideStormwater and Detention: What St. Louis-Area Developers Should Plan ForWho reviews stormwater where, detention and bioretention options, and land disturbance permits.Open GuideMSD's 2027 Rules: What Changes for St. Louis Site DevelopmentYour submittal date decides your rulebook: the 2027 stormwater, sanitary and strapped plumbing changes, side by side with 2018.Open GuideRedeveloping a St. Louis Site Under MSD's 2027 Rules: Existing Pavement, Cumulative Disturbance and AdditionsHow MSD's 2027 draft rules treat redevelopment: when existing pavement gets no credit, cumulative disturbance since 2006, additions to old basins, and exemptions.Open GuideBuilding Near a Floodplain Under MSD's 2027 Rules: Studies, Elevations and ParkingWhat MSD's 2027 draft changes for floodplain sites: simplified vs. detailed studies, FEMA draft data, floor and sill elevations, parking and culverts.Open GuideStorm Sewer and Inlet Design Under MSD's 2027 Rules: What Changes in the FieldMSD's 2027 draft storm sewer changes: continuity with existing systems, sag inlets, 4 cfs inlet rule, slope outfalls and manhole spacing, from a site contractor.Open GuideDetention Basins and BMPs Under MSD's 2027 Rules: Build Details, Reports and Getting Your Deposit BackMSD's 2027 draft basin and BMP details: outlet structures, trash racks, liners, vegetation, as-builts, the BMP hand-off meeting and deposit release.Open GuideMSD Utility Work: How Permitted Sewer and Storm Work Generally FlowsThe general flow of MSD-permitted sanitary and storm work: approval, permits, inspections and as-builts.Open PageFor Civil & Geotechnical EngineersStabilization vs. undercut budgets, spec constructability review, and lunch-and-learns.Open PageBioretention BasinsHow we build bioretention and water-quality basins.Open PageMSD WorkStormwater and sewer work under MSD permits in St. Louis City and County.Open
Call (636) 978-3478