Service · Commercial Site Work

Commercial Site Work & Site Preparation in St. Louis

A site work contractor turns raw ground into a buildable site by clearing it, grading it, fixing weak subgrade and putting the underground utilities in, and Kuesel does that work in St. Louis.

As a site work contractor, Kuesel provides site preparation services for commercial and industrial sites across St. Louis: clearing, mass grading, building pads, underground utilities and paving subgrade.

Our commercial and industrial site work runs on private commercial and industrial lots across the St. Louis area, carrying a parcel to a pad and pavement base that is ready for the building and paving trades. We self-perform most of that sequence with union crews and our own equipment, so the steps run on one schedule instead of being handed between subs.

Aerial view of clearing and grading for a new development
Site work

What a commercial and industrial site work contractor does

On a typical job the site work contractor sits between the civil engineer's plans and the building trades. We shape the ground through commercial excavation and mass grading, treat soft clay in place with soil stabilization when it fails proof roll, and install water, sewer, storm and conduit as part of our site utilities scope. Finished work from those scopes is on our projects page.

Site preparation services

Site preparation in construction is the work that readies a parcel before grading starts: clearing and grubbing, stripping topsoil, setting construction entrances and laying out haul routes. It sets the footprint and access the rest of the job depends on. Good site preparation contractors also plan where stripped material goes, so it is not moved twice.

Step by step

The site work sequence

We're based in O'Fallon, MO and work across St. Louis, St. Charles County and the greater St. Louis metro, including the Illinois Metro East.

  1. 01

    Clearing & site preparation

    Site preparation services come first: clearing and grubbing, stripping topsoil, setting construction entrances and laying out haul routes so grading can start cleanly. On wooded or overgrown parcels, this is where the site gets opened up.

    Earthwork & site grading →
  2. 02

    Earthwork & mass grading

    Mass cut and fill shapes the site to the grading plan — building pads, parking areas and drives. Grading plans are modeled before we mobilize and our dozers run GPS machine control, so the surface we price is the surface we cut. Balancing the site on paper first keeps import and export down.

    Earthwork & mass grading →
  3. 03

    Soil stabilization

    When subgrade fails proof roll, it can be treated in place with lime or cement instead of undercut and replaced. The geotechnical engineer and the lab mix design decide the agent, rate and depth; we spread, mix and compact to that design.

    Soil stabilization →
  4. 04

    Site utilities

    Water, sanitary and storm sewer, fire lines and conduit go in once the site is near grade, tied into the same schedule as the earthwork. The full underground scope is described on our site utilities page.

    Site utilities →
  5. 05

    Erosion & sediment control

    Erosion and sediment control measures are installed and maintained as part of our utility and grading work, and storm structures and detention are often built early so they can serve as sediment control during construction.

    Water & sewer →
  6. 06

    Paving prep & full-depth reclamation

    Before paving, the subgrade and base are graded and proof-rolled with the GC and the owner's testing agency. On existing lots where asphalt has failed through the base, full-depth reclamation recycles the old pavement in place into a new stabilized base.

    Full-depth reclamation →

Planning a site before you buy it? See our Early Site Budget for developers or preconstruction services.

Before dirt moves

Permits and utility locates before dirt moves

  • Missouri DNR requires a land disturbance permit for construction that disturbs one or more acres, including smaller disturbances that are part of a larger common plan of development or sale. The main requirement of the permit is a stormwater pollution prevention plan. Source: Missouri DNR: construction land disturbance
  • Missouri law requires an excavator to notify the notification center at least two working days, and not more than ten working days, before excavating. Source: RSMo 319.026

Local requirements vary by jurisdiction, so check with the city or county where the site sits. Read more about land disturbance permits and stormwater requirements in St. Louis.

Technology

Technology on the site

Our grading plans are modeled in the office before a machine is unloaded, and GPS machine control on the dozers holds the cut to that model in the field. More on the tools we use is on our innovation page.

Case studies

Commercial site work we've delivered.

  • Fenton, MO

    Freight Terminal Expansion

    Complete site package for a freight terminal building addition: a structural-fill pad, more than 2,400 LF of storm sewer, two underground detention systems and a new water main.

    Self-performed: Site clearing, mass grading, structural fill pad, storm, detention, sanitary and water.

    View project →
  • Berkeley, MO

    Commercial Equipment Yard

    Equipment yard and building: subgrade stabilized with 10" of Portland cement under a millings surface, more than 2,500 LF of storm and 2,440 CY of bio-retention.

    Self-performed: Clearing, removals, grading, cement stabilization, millings surface, storm, bio-retention, sanitary and water.

    View project →
  • St. Peters, MO

    Food Plant Building Addition

    Site work for a building addition at an operating food processing plant, with the slab subgrade remediated 2' deep with crushed stone.

    Self-performed: Removals, grading, slab subgrade remediation, storm and French drain.

    View project →
Bidding

What to send for a site work bid

  • Plans
  • Specs
  • Geotech report

Send the plans, specs and geotechnical report through Request a Bid. The geotech report drives the subgrade and stabilization scope, so including it up front keeps the number accurate.

FAQ

Site work FAQs

What does a site work contractor do?
A site work contractor prepares land for a building: clearing, earthwork and grading, subgrade stabilization where soils are poor, site utilities, erosion and sediment control, and the subgrade and base for paving. Kuesel self-performs that work in St. Louis.
What is site preparation in construction?
Site preparation is the first phase of site work: clearing and grubbing, stripping topsoil, setting construction entrances and laying out haul routes so grading can start cleanly.
What does commercial site work include?
Commercial site work usually covers clearing and site preparation, earthwork and mass grading, subgrade stabilization where soils are poor, site utilities, erosion and sediment control, and preparing the subgrade and base for paving. Kuesel self-performs those scopes on private commercial and industrial lots.
Do I need a land disturbance permit in Missouri?
Missouri DNR requires a land disturbance permit for construction that disturbs one or more acres, including smaller disturbances that are part of a larger common plan of development or sale. Its main requirement is a stormwater pollution prevention plan. Local requirements vary by jurisdiction.
How far ahead do utilities need to be located before excavating?
Missouri law requires an excavator to notify the notification center at least two working days, and not more than ten working days, before excavating.
How do I get a site work bid?
Send plans, specs and the geotech report through Request a Bid. We confirm whether we're bidding within 1 business day. Most of our site work is bid to general contractors and developers as the site subcontractor, and developers with land under contract can also start with an Early Site Budget. Office hours are Monday–Friday, 7:00 AM–4:00 PM.
Pricing a job? See public bid data on St. Louis site work unit prices.