In St. Louis, MO
Urban Infill Multifamily
The infill site received 871 LF of storm, bio-retention, sanitary sewer and a new 6-inch water tap with street repair under MSD permits.
View project →MSD is the sewer district for the City of St. Louis, so storm and sanitary work here runs through its inspections. Downtown tie-ins also mean traffic control and old, crowded crossings. Corporate headquarters sitework included underground utilities.
Local context: Utility tie-ins in the city land next to aging mains and services, so we verify every crossing before trenching.
Get a St. Louis Bid






St. Louis: The infill site received 871 LF of storm, bio-retention, sanitary sewer and a new 6-inch water tap with street repair under MSD permits.
In St. Louis, MO
The infill site received 871 LF of storm, bio-retention, sanitary sewer and a new 6-inch water tap with street repair under MSD permits.
View project →In St. Louis, MO
Kuesel replaced the old drainage with 80 LF of storm and a hydrodynamic separator for MSD water-quality requirements on a tighter footprint.
View project →In St. Louis, MO
The building received about 420 LF of storm, underground detention, sanitary and a 6-inch water tap with fire service and street repair under MSD permits.
View project →In St. Louis, MO
A failed 15-inch sanitary main was replaced with SDR 26 and a 6-inch lateral repaired, followed by 10-inch concrete street restoration under traffic control.
View project →Inside the city, the constraints are traffic control on active streets, event schedules that shut down blocks, and decades of buried utilities that rarely match the record drawings. We plan haul routes and work windows around all three, and pothole existing lines before the excavator goes in.
All Kuesel services in St. Louis →