Near Collinsville — St. Louis, MO
Urban Infill Multifamily
The infill site received 871 LF of storm, bio-retention, sanitary sewer and a new 6-inch water tap with street repair under MSD permits.
View project →Commercial sites along I-55/70 in Collinsville usually need short sanitary and water services and a storm system that handles runoff from the parking lot. On bluff-edge lots we set storm grades to carry water off the slope and phase trenches so the lot stays usable.
Local context: Big Collinsville parking fields drive the size of the site storm system.
Get a Collinsville Bid






St. Louis provides nearby project evidence for Collinsville, not a claim of work inside Collinsville. The infill site received 871 LF of storm, bio-retention, sanitary sewer and a new 6-inch water tap with street repair under MSD permits.
Near Collinsville — St. Louis, MO
The infill site received 871 LF of storm, bio-retention, sanitary sewer and a new 6-inch water tap with street repair under MSD permits.
View project →Near Collinsville — St. Louis, MO
Kuesel replaced the old drainage with 80 LF of storm and a hydrodynamic separator for MSD water-quality requirements on a tighter footprint.
View project →Near Collinsville — St. Louis, MO
The building received about 420 LF of storm, underground detention, sanitary and a 6-inch water tap with fire service and street repair under MSD permits.
View project →Near Collinsville — St. Louis, MO
A failed 15-inch sanitary main was replaced with SDR 26 and a 6-inch lateral repaired, followed by 10-inch concrete street restoration under traffic control.
View project →Interstate commercial sites in Collinsville need pads, large parking fields, and storm systems built for a lot of new pavement. Some parcels sit on the bluff and some on bottomland, so soil conditions change across town.
All Kuesel services in Collinsville →