Build-to-Rent Sanitary Main
Kuesel installed 1,760 LF of 12-inch sanitary, upsized from 10 inches, and lowered a 526 LF segment by 2 feet while converting it to C900 to resolve a grade conflict.
View project →New industrial sites along Wentzville's I-70 corridor often need long extensions to reach existing mains, across open ground that has never had service. We trench, lay and test those long runs before the pad and paving are built over them.
Local context: New Wentzville industrial parks need storm detention and wet utilities built in the first phase.
Get a Wentzville Bid






Wentzville: Kuesel installed 1,760 LF of 12-inch sanitary, upsized from 10 inches, and lowered a 526 LF segment by 2 feet while converting it to C900 to resolve a grade conflict.
In Wentzville, MO
Kuesel installed 1,760 LF of 12-inch sanitary, upsized from 10 inches, and lowered a 526 LF segment by 2 feet while converting it to C900 to resolve a grade conflict.
View project →
Near Wentzville — Foristell, MO
The park construction package included utilities as well as sitework, trails and a playground; individual pipe quantities are not listed.
View project →Near Wentzville — O'Fallon, MO
Kuesel installed 85 LF of 12-inch RCP storm, relocated a flared end and tied into the existing drainage, with riprap and rock check dams.
View project →Near Wentzville — St. Peters, MO
The addition's drainage included 743 LF of storm pipe and 357 LF of perforated French drain while the plant stayed in operation.
View project →Industrial ground west of the Highway 40/61 interchange is often rolling farmland, which means large cuts and fills to reach a flat pad. Suppliers serving the GM area want truck access and storm detention built early.