In St. Peters, MO
Food Plant Building Addition
The addition's drainage included 743 LF of storm pipe and 357 LF of perforated French drain while the plant stayed in operation.
View project →Large logistics buildings in St. Peters need long storm runs, fire-line water, and sanitary service, with storm runs sized for the added roof and pavement area. At Logistics Sitework in St. Peters we installed the wet utilities alongside the earthwork.
Local context: New truck courts in St. Peters mean large storm systems and wet utilities sized for added pavement.
Get a St. Peters Bid






St. Peters: The addition's drainage included 743 LF of storm pipe and 357 LF of perforated French drain while the plant stayed in operation.
In St. Peters, MO
The addition's drainage included 743 LF of storm pipe and 357 LF of perforated French drain while the plant stayed in operation.
View project →In St. Peters, MO
Kuesel replaced 16 LF of 10-inch ductile iron fire main and reconnected it, then restored the concrete floor and sidewalk opened to reach the line.
View project →
In St. Peters, MO
Wet utilities were installed as part of the greenfield logistics site's mass earthwork and grading package.
View project →Near St. Peters — O'Fallon, MO
Kuesel installed 85 LF of 12-inch RCP storm, relocated a flared end and tied into the existing drainage, with riprap and rock check dams.
View project →Logistics buildings want large, flat pads, wide truck courts, and storm systems sized for a lot of new pavement. The work is mass earthwork and wet utilities done in phases so the building contractor can start before the whole site is finished.
All Kuesel services in St. Peters →