Site conditionsEvent-day logistics and urban excavation
Event days close streets and fill sidewalks, so deliveries, hauling, and lane closures are scheduled around the calendar. Downtown digs also run into old foundations and dense utilities, which we pothole before excavating.
Project proofKuesel projects in and near Downtown St. Louis
St. Louis provides nearby project evidence for Downtown St. Louis, not a claim of work inside Downtown St. Louis. Urban infill in the City of St. Louis: houses and foundations demolished, about 4,000 CY exported, and new storm, bio-retention, sanitary and a 6" water tap, permitted through MSD.
Near Downtown St. Louis — St. Louis, MO
Urban Infill Multifamily
Urban infill in the City of St. Louis: houses and foundations demolished, about 4,000 CY exported, and new storm, bio-retention, sanitary and a 6" water tap, permitted through MSD.
View project →Near Downtown St. Louis — St. Louis, MO
Food Plant Site Redevelopment
Site redevelopment at a City of St. Louis food manufacturing facility: old pavement, stairs and storm system removed, regraded with import, and a hydrodynamic separator for MSD water quality.
View project →Near Downtown St. Louis — St. Louis, MO
Institutional Building Basement & Utilities
Basement excavation and site utilities for a new institutional building in south St. Louis City, with hydro excavation near existing lines and an underground detention system.
View project →Near Downtown St. Louis — St. Louis, MO
Industrial Campus Sanitary Replacement
Failed 15" sanitary main replaced with SDR 26 on an active industrial campus in the City of St. Louis, with a lateral repair and concrete street restoration under traffic control.