In Crestwood, MO
Convenience Store & Fuel Station
Site development for a new convenience store and fuel station in Crestwood: about 1,300 LF of storm, two hydrodynamic separators and a roughly 14,000 CF underground detention system.
View project →Watson Road in Crestwood is a redevelopment corridor, and Kuesel built the site for a new convenience store and fuel station there. We take on small, busy commercial lots where every utility has to fit under the pavement.
Redevelopment lots along a commercial corridor rarely have room for a surface basin. Old pavement and utilities come out first, and stormwater detention and water-quality treatment often go underground beneath parking and drives.
Crestwood: Site development for a new convenience store and fuel station in Crestwood: about 1,300 LF of storm, two hydrodynamic separators and a roughly 14,000 CF underground detention system.
In Crestwood, MO
Site development for a new convenience store and fuel station in Crestwood: about 1,300 LF of storm, two hydrodynamic separators and a roughly 14,000 CF underground detention system.
View project →Near Crestwood — Fenton, MO
Complete site package for a freight terminal building addition in Fenton: a structural-fill pad, more than 2,400 LF of storm sewer, two underground detention systems and a new water main.
View project →Near Crestwood — Town and Country, MO
New athletic-field parking lot at a private school in Town and Country: old structures abandoned, lot graded to ±0.10', 372 LF of storm and a 219 CY bio-retention cell.
View project →Near Crestwood — St. Louis, MO
Urban infill in the City of St. Louis: houses and foundations demolished, about 4,000 CY exported, and new storm, bio-retention, sanitary and a 6" water tap, permitted through MSD.
View project →| County | St. Louis County |
|---|---|
| Distance from HQ | About 24 miles southeast of O'Fallon, MO (straight line) |
| State | Missouri |
| Sewer district | Metropolitan St. Louis Sewer District (MSD) |