Industrial

Clarksville tire plant Phase II expansion (2.2M SF) – sitework, stabilization & utilities — Clarksville, TN

Montgomery County

Tire plant expansion, Clarksville, TN — Kuesel sitework

Project summary

Kuesel performed full-scope heavy civil work on a tire plant expansion in Clarksville, Tennessee.

The 2.2 million square foot expansion required 536,700 CY of dirt to be moved.

Kuesel self-performed the site utilities and soil stabilization, including lime treatment of the industrial building pad.

This is Kuesel's largest project to date, and Kuesel has worked multiple phases at the Clarksville plant in Montgomery County. Phase II added 2.2 million SF of new production and support facilities on the campus, plus additions to the existing plant, rail spur additions and deep equipment pits. It doubled the plant's passenger and light-truck tire capacity and added truck and bus tire production.

LocationClarksville, TN
MarketIndustrial
ScopeFull scope heavy civil — mass earthmoving, site utilities, stabilization, paving
Key facts2.2M SF Phase II expansion · 536,700 CY of dirt moved · 327,817 SY stabilization · about 28,900 LF utilities

Challenge → approach

Phase II combined a huge earthwork balance with deep, precise excavation: tunnels and mixing, cooling-water and carbon unloading pits cut inside a building pad that also had to be lime-stabilized at three different depths and rates. Kuesel located existing utilities by hydro excavation and ran the work under a full SWPPP.

Phase II

On Phase II, Kuesel cleared about 80 acres and moved 536,700 CY of dirt, including structural and deep pit excavation for tunnels and mixing, cooling-water and carbon unloading pits.

Crews lime-stabilized 327,817 SY under the building pad, pavements, rail spur and laydown yards using about 10,300 tons of lime, placed about 135,000 tons of aggregate base and surface, and installed about 28,900 LF of utilities.

  • 80 acres cleared
  • 536,700 CY of dirt moved (including structural and deep pit excavation)
  • ~31,000 CY topsoil stripped/respread
  • 327,817 SY lime stabilization (pad 16" @ 5%, pavements & rail 12" @ 4%, laydown 12" @ 3%) using ~10,300 tons of lime
  • ~135,000 tons aggregate base & surface
  • ~28,900 LF utilities
  • 124 storm structures
  • 23 hydrants
  • 26 PIVs
  • Hydro-ex locating
  • Full SWPPP

Related services

Invite Kuesel to bid
Scope on this job

What each service covered

Earthwork & Site Grading

Commercial excavation and heavy civil earthmoving for site development, roadways, and industrial pads throughout the St. Louis region.

Water & Sewer Infrastructure

Underground utility construction — water lines, sanitary sewer, storm sewer, and manholes for commercial and industrial site work.

Soil Stabilization

Lime and cement stabilization, full-depth reclamation, and subgrade improvement for asphalt contractors and site work in St. Louis.

Industrial & Mission Critical Sitework

Heavy civil sitework for industrial plants, distribution centers, and mission-critical facilities where schedule and subgrade matter.

Hydrovac & Specialty Services

Non-destructive excavation, bio pond and detention basin repair, and storm pipe cleaning.

Site Demolition

Structural and site-specific demolition with full waste management and recycling.

More Industrial work

Other industrial projects

O'Fallon, MO

Curb removal, yard grading, crushed limestone surface, concrete approach, storm and erosion control

View project →

St. Louis, MO

15" sanitary replacement, lateral repair, concrete street repair, traffic control

View project →
Call (636) 978-3478