Site conditionsLakeside development and medical campuses
Work near the lakes calls for tight erosion and sediment control so runoff stays out of the water. Medical campus projects add phasing around open facilities and dense existing utilities.
Project proofKuesel projects in and near Lake Saint Louis
Wentzville provides nearby project evidence for Lake Saint Louis, not a claim of work inside Lake Saint Louis. Sanitary main for a build-to-rent single-family community in Wentzville: about 1,700 LF of 12" PVC upsized from 10", with a 526 LF segment lowered and converted to C900.
Near Lake Saint Louis — Wentzville, MO
Build-to-Rent Sanitary Main
Sanitary main for a build-to-rent single-family community in Wentzville: about 1,700 LF of 12" PVC upsized from 10", with a 526 LF segment lowered and converted to C900.
View project →Near Lake Saint Louis — O'Fallon, MO
Industrial Yard Improvements
Yard improvements at an operating construction-products facility in O'Fallon: regraded yard, crushed limestone surface over geotextile, new storm and erosion control.
View project →Near Lake Saint Louis — St. Peters, MO
Food Plant Building Addition
Site work for a building addition at an operating food processing plant in St. Peters: slab subgrade remediated 2' deep with crushed stone, plus new storm and French drain.
View project →Near Lake Saint Louis — St. Peters, MO
Retail Store Fire Main Repair
Fire main repair at a big-box retail store in St. Peters: 10" ductile iron replaced and reconnected, with the concrete floor and sidewalk removed and restored.
View project →