Site conditionsI-55/70 commercial
Interstate commercial sites in Collinsville need pads, large parking fields, and storm systems built for a lot of new pavement. Some parcels sit on the bluff and some on bottomland, so soil conditions change across town.
Project proofKuesel projects in and near Collinsville
St. Louis provides nearby project evidence for Collinsville, not a claim of work inside Collinsville. Urban infill in the City of St. Louis: houses and foundations demolished, about 4,000 CY exported, and new storm, bio-retention, sanitary and a 6" water tap, permitted through MSD.
Near Collinsville — St. Louis, MO
Urban Infill Multifamily
Urban infill in the City of St. Louis: houses and foundations demolished, about 4,000 CY exported, and new storm, bio-retention, sanitary and a 6" water tap, permitted through MSD.
View project →Near Collinsville — St. Louis, MO
Food Plant Site Redevelopment
Site redevelopment at a City of St. Louis food manufacturing facility: old pavement, stairs and storm system removed, regraded with import, and a hydrodynamic separator for MSD water quality.
View project →Near Collinsville — St. Louis, MO
Institutional Building Basement & Utilities
Basement excavation and site utilities for a new institutional building in south St. Louis City, with hydro excavation near existing lines and an underground detention system.
View project →Near Collinsville — St. Louis, MO
Industrial Campus Sanitary Replacement
Failed 15" sanitary main replaced with SDR 26 on an active industrial campus in the City of St. Louis, with a lateral repair and concrete street restoration under traffic control.
View project →