Research

Site work data.

Reports built from public data, with the source and method on every page.

St. Louis Site Work Unit Prices 2023: 22 MoDOT Items

22 MoDOT 2023 St. Louis District average bid prices; storm pipe is 7 of 22 items (31.8%).

Key findings

  • The MoDOT 2023 Unit Bid Prices — St. Louis District set used here contains 22 distinct site-work bid items after removing 4 duplicate rows.
  • Storm pipe is the largest group: 7 of 22 items (31.8% of all items).
  • The most common pay unit is LF: 9 of 22 items (40.9%) are priced per LF.
Read the full report, source and method →
Call (636) 978-3478