Retail store pavement subgrade – cement stabilization — Alton, IL

Madison County · 2025

Project summary

At a national retail store in Alton, Madison County, Illinois, Kuesel stabilized the pavement subgrade with Portland cement. About 4,300 SY were treated to a 12" depth at 7% cement.

Crews exported 250 CY of excess and restored the subgrade to ±0.10' so paving could follow.

LocationAlton, IL
MarketCommercial / Retail
Scope12" Portland cement stabilization at 7%, spoil export, subgrade to ±0.10'

Challenge → approach

Instead of undercutting and replacing the pavement subgrade, Kuesel treated it in place with cement, exported only the excess, and handed the paver a subgrade at ±0.10'.

Scope delivered

  • 4,293 SY of 12" depth Portland cement stabilization at 7%
  • 250 CY spoil export
  • Subgrade restored to ±0.10'

Key quantities

  • 4,293 SY stabilized
  • 12" depth at 7% cement
  • 250 CY export

Services used

Invite Kuesel to bid
Scope on this job

What each service covered

Soil Stabilization

Lime and cement stabilization, full-depth reclamation, and subgrade improvement for asphalt contractors and site work in St. Louis.

More Commercial / Retail work

Other commercial / retail projects

St. Peters, MO

10" ductile iron fire main repair, reconnection, concrete floor and sidewalk replacement

View project →

Crestwood, MO

Removals, grading, subgrade, storm, hydrodynamic separators, underground detention, sanitary and water

View project →