In St. Peters, MO
Food Plant Building Addition
Site work around the operating food plant combined removals, slab-subgrade remediation and storm drainage for its building addition.
View project →Industrial growth in St. Peters near I-70 and Highway 370 favors big, flat pads with room for backup power. Our Logistics Sitework work in St. Peters covered mass earthwork, grading, and wet utilities on a greenfield site — the same base a generator yard and duct bank route are built on.
Local context: St. Peters industrial sites near Highway 370 call for big pads and utilities phased for early building starts.
Get a St. Peters Bid






St. Peters: Site work around the operating food plant combined removals, slab-subgrade remediation and storm drainage for its building addition.
In St. Peters, MO
Site work around the operating food plant combined removals, slab-subgrade remediation and storm drainage for its building addition.
View project →
In St. Peters, MO
The industrial logistics project combined a mass-graded pad with wet utilities; the listed scope does not claim duct banks or generator work.
View project →In St. Peters, MO
Fire main repair at a big-box retail store in St. Peters: 10" ductile iron replaced and reconnected, with the concrete floor and sidewalk removed and restored. The record does not document mission critical work.
View project →Near St. Peters — O'Fallon, MO
Yard improvements at an operating construction-products facility in O'Fallon: regraded yard, crushed limestone surface over geotextile, new storm and erosion control. The record does not document mission critical work.
View project →Logistics buildings want large, flat pads, wide truck courts, and storm systems sized for a lot of new pavement. The work is mass earthwork and wet utilities done in phases so the building contractor can start before the whole site is finished.
All Kuesel services in St. Peters →