In Chesterfield, MO
Chesterfield Levee & Trail Improvements
Kuesel widened the levee about 10 feet, raised it with fill and graded the Phase 6 levee trail. The record does not document mission critical work.
View project →Behind the Chesterfield Valley levee, the water table and floodplain soils drive how deep a duct bank can go and how a generator yard is drained. We plan bedding, dewatering, and pad elevation before digging. In Chesterfield we built the mixed-use development and worked on the Chesterfield Phase 6 levee trail.
Local context: Industrial pads in Chesterfield Valley sit on levee-protected bottomland, so fill control matters from day one.
Get a Chesterfield Bid






Chesterfield: Kuesel widened the levee about 10 feet, raised it with fill and graded the Phase 6 levee trail. The record does not document mission critical work.
In Chesterfield, MO
Kuesel widened the levee about 10 feet, raised it with fill and graded the Phase 6 levee trail. The record does not document mission critical work.
View project →
In Chesterfield, MO
Kuesel built the mixed-use site's mass excavation, custom wet utility runs and lake. The record does not document mission critical work.
View project →Near Chesterfield — Town and Country, MO
New athletic-field parking lot at a private school in Town and Country: old structures abandoned, lot graded to ±0.10', 372 LF of storm and a 219 CY bio-retention cell. The record does not document mission critical work.
View project →Near Chesterfield — Maryland Heights, MO
Site prep for a lab building addition in Maryland Heights: existing utilities located by hydro excavation before digging, then removals, grading, subgrade and new storm. The record does not document mission critical work.
View project →Chesterfield Valley is bottomland protected by the Chesterfield levee. Sites there deal with high groundwater and soft alluvial soils, and fill placement has to be controlled to the geotechnical spec.