Near Collinsville — St. Louis, MO
Urban Infill Multifamily
House and foundation demolition preceded grading with about 4,000 CY of export from a tight urban infill site.
View project →Commercial pads along the I-55/70 corridor in Collinsville often sit on the bluff edge, where hillside cuts and fills meet parking lots and drive lanes. We grade the pad and parking subgrade together so drainage works from building to curb.
Local context: Collinsville parcels run from bluff to bottomland, so grading plans change site to site.
Get a Collinsville Bid






St. Louis provides nearby project evidence for Collinsville, not a claim of work inside Collinsville. House and foundation demolition preceded grading with about 4,000 CY of export from a tight urban infill site.
Near Collinsville — St. Louis, MO
House and foundation demolition preceded grading with about 4,000 CY of export from a tight urban infill site.
View project →Near Collinsville — St. Louis, MO
Old pavement, stairs and storm features were removed before grading with import and preparing building and pavement subgrade.
View project →Near Collinsville — St. Louis, MO
Kuesel excavated the full basement, backfilled the exterior foundation and graded the city site, using hydro excavation near existing utilities.
View project →Near Collinsville — St. Louis, MO
Failed 15" sanitary main replaced with SDR 26 on an active industrial campus in the City of St. Louis, with a lateral repair and concrete street restoration under traffic control. The record does not document earthwork work.
View project →Interstate commercial sites in Collinsville need pads, large parking fields, and storm systems built for a lot of new pavement. Some parcels sit on the bluff and some on bottomland, so soil conditions change across town.
All Kuesel services in Collinsville →