In Chesterfield, MO
Chesterfield Levee & Trail Improvements
Levee earthwork included widening by about 10 feet and raising with fill, together with grading for the Phase 6 trail.
View project →Chesterfield Valley sits in floodplain behind the levee, so sites often need fill to reach design elevation and careful compaction over soft, wet ground. At the mixed-use development we handled mass excavation and lake construction, and we also worked on the Chesterfield Phase 6 levee trail.
Local context: In Chesterfield we've moved dirt for the mixed-use development and raised the levee with fill.
Get a Chesterfield Bid






Chesterfield: Levee earthwork included widening by about 10 feet and raising with fill, together with grading for the Phase 6 trail.
In Chesterfield, MO
Levee earthwork included widening by about 10 feet and raising with fill, together with grading for the Phase 6 trail.
View project →
In Chesterfield, MO
Mass excavation and lake construction formed Kuesel's earthwork scope on the mixed-use development.
View project →Near Chesterfield — Town and Country, MO
Old storm and sanitary structures were abandoned before grading the athletic-field parking lot and preparing pavement and walk subgrade to ±0.10'.
View project →Near Chesterfield — Maryland Heights, MO
Hydro excavation located existing lines before pavement and curb removal, grading and building-addition subgrade preparation.
View project →Chesterfield Valley is bottomland protected by the Chesterfield levee. Sites there deal with high groundwater and soft alluvial soils, and fill placement has to be controlled to the geotechnical spec.
All Kuesel services in Chesterfield →