In St. Peters, MO
Food Plant Building Addition
At the operating plant, Kuesel removed concrete and trees, graded the addition and replaced slab subgrade to a 2-foot depth with crushed stone.
View project →Logistics buildings near I-70 and Highway 370 in St. Peters need large pads graded flat across a lot of acreage. At Logistics Sitework in St. Peters we handled mass earthwork and grading on a greenfield site, balancing material across the pad before the building went up.
Local context: Logistics pads in St. Peters are mass-earthwork jobs, as Logistics Sitework was.
Get a St. Peters Bid






St. Peters: At the operating plant, Kuesel removed concrete and trees, graded the addition and replaced slab subgrade to a 2-foot depth with crushed stone.
In St. Peters, MO
At the operating plant, Kuesel removed concrete and trees, graded the addition and replaced slab subgrade to a 2-foot depth with crushed stone.
View project →
In St. Peters, MO
Mass earthwork and grading prepared the greenfield logistics pad, coordinated with the wet utility installation.
View project →In St. Peters, MO
Fire main repair at a big-box retail store in St. Peters: 10" ductile iron replaced and reconnected, with the concrete floor and sidewalk removed and restored. The record does not document earthwork work.
View project →Near St. Peters — O'Fallon, MO
The operating facility's yard was cut and filled, graded to ±0.10' and surfaced with crushed limestone over geotextile.
View project →Logistics buildings want large, flat pads, wide truck courts, and storm systems sized for a lot of new pavement. The work is mass earthwork and wet utilities done in phases so the building contractor can start before the whole site is finished.