Project proofKuesel projects in and near St. Louis
St. Louis: Urban infill in the City of St. Louis: houses and foundations demolished, about 4,000 CY exported, and new storm, bio-retention, sanitary and a 6" water tap, permitted through MSD. The record does not document chemical soil stabilization work.
In St. Louis, MO
Urban Infill Multifamily
Urban infill in the City of St. Louis: houses and foundations demolished, about 4,000 CY exported, and new storm, bio-retention, sanitary and a 6" water tap, permitted through MSD. The record does not document chemical soil stabilization work.
View project →In St. Louis, MO
Food Plant Site Redevelopment
Site redevelopment at a City of St. Louis food manufacturing facility: old pavement, stairs and storm system removed, regraded with import, and a hydrodynamic separator for MSD water quality. The record does not document chemical soil stabilization work.
View project →In St. Louis, MO
Institutional Building Basement & Utilities
Basement excavation and site utilities for a new institutional building in south St. Louis City, with hydro excavation near existing lines and an underground detention system. The record does not document chemical soil stabilization work.
View project →In St. Louis, MO
Industrial Campus Sanitary Replacement
Failed 15" sanitary main replaced with SDR 26 on an active industrial campus in the City of St. Louis, with a lateral repair and concrete street restoration under traffic control. The record does not document chemical soil stabilization work.
View project → Working in St. LouisSt. Louis, MO at a glance
- County
- St. Louis (independent city)
- Drive from our O'Fallon, MO yard
- 25 min
- Population (2020 census)
- 301,578
Inside the city, the constraints are traffic control on active streets, event schedules that shut down blocks, and decades of buried utilities that rarely match the record drawings. We plan haul routes and work windows around all three, and pothole existing lines before the excavator goes in.
All Kuesel services in St. Louis →