Chesterfield, MO · Service 05

Soil Stabilization
in Chesterfield, MO.

Floodplain subgrade in Chesterfield Valley is often wet and soft, and undercut there can reach groundwater before firm material. Stabilizing in place can avoid that; lime fits clays and cement fits siltier soils, as our guide explains. Local proof includes the mixed-use development and the Chesterfield Phase 6 levee trail.

Lime vs. cement vs. undercut guide →

Local context: Soft Valley soils behind the levee are a common reason to treat subgrade in place.

Get a Chesterfield Bid
Soil Stabilization contractor in Chesterfield, MO — Lime and cement stabilization, full-depth reclamation, and subgrade improvement for asphalt contractors and site work in St. Louis.
What's Included

Soil Stabilization capabilities in Chesterfield

  • Lime stabilization
  • Cement stabilization
  • Full-depth reclamation (FDR)
  • Subgrade drying
  • Geogrid & geotextile install
  • Proof rolling with the GC and the owner's testing agency
On the Job

Soil Stabilization in action

Spreader trucks placing stabilization agent on subgrade — Chesterfield, MO
Wirtgen reclaimer performing full-depth reclamation on a roadway — Chesterfield, MO
Water truck supporting full-depth reclamation operations — Chesterfield, MO
Lime spread on subgrade ahead of mixing — Chesterfield, MO
Spreader trucks on a cement stabilization job — Chesterfield, MO
Reclaimer mixing stabilized subgrade — Chesterfield, MO
Project proof

Kuesel projects in and near Chesterfield

Chesterfield: Kuesel widened the levee about 10 feet, raised it with fill and graded the Phase 6 levee trail. The record does not document chemical soil stabilization work.

In Chesterfield, MO

Chesterfield Levee & Trail Improvements

Kuesel widened the levee about 10 feet, raised it with fill and graded the Phase 6 levee trail. The record does not document chemical soil stabilization work.

View project →
Mixed-Use Development & Lake — Chesterfield

In Chesterfield, MO

Mixed-Use Development & Lake

Kuesel built the mixed-use site's mass excavation, custom wet utility runs and lake. The record does not document chemical soil stabilization work.

View project →

Near Chesterfield — Town and Country, MO

Private School Athletic Parking Lot

New athletic-field parking lot at a private school in Town and Country: old structures abandoned, lot graded to ±0.10', 372 LF of storm and a 219 CY bio-retention cell. The record does not document chemical soil stabilization work.

View project →

Near Chesterfield — Maryland Heights, MO

Laboratory Building Addition

Site prep for a lab building addition in Maryland Heights: existing utilities located by hydro excavation before digging, then removals, grading, subgrade and new storm. The record does not document chemical soil stabilization work.

View project →
Working in Chesterfield

Chesterfield, MO at a glance

County
St. Louis County
Drive from our O'Fallon, MO yard
25 min
Population (2020 census)
47,484

Chesterfield Valley is bottomland protected by the Chesterfield levee. Sites there deal with high groundwater and soft alluvial soils, and fill placement has to be controlled to the geotechnical spec.

All Kuesel services in Chesterfield →
FAQ
Why not just undercut soft ground in Chesterfield Valley?
Undercut may reach groundwater and need a lot of imported rock. Stabilization can be the faster option; we price both.
Call (636) 978-3478