Commercial / Retail

Convenience store & fuel station – site development & utilities — Crestwood, MO

St. Louis County · 2026

Project summary

On a busy commercial corridor in Crestwood, St. Louis County, Kuesel built the site for a new convenience store and fuel station. Crews removed existing pavement, sidewalk, curb, storm and sanitary, cut and filled the site, and built building, pavement, sidewalk and curb subgrade to ±0.10'.

Storm work included about 1,300 LF of 4" to 36" PVC and HP pipe, 58 LF of trench drain, eight manholes, six curb inlets, two hydrodynamic separators, an outfall and a roughly 14,000 CF underground detention system. A 6" sanitary service with sampling manhole and 2" domestic water rounded out the work, with SWPPP and MSD permits.

LocationCrestwood, MO
MarketCommercial / Retail
ScopeRemovals, grading, subgrade, storm, hydrodynamic separators, underground detention, sanitary and water

Challenge → approach

A fuel station on a small corridor lot has no room for a surface basin. Kuesel put detention underground and handled water quality with two hydrodynamic separators, fitting the full storm, sanitary and water package under the pavement.

Scope delivered

  • Saw-cut, sidewalk and curb removal
  • Storm and sanitary removal
  • Grading cut/fill
  • Building, pavement, sidewalk and curb subgrade to ±0.10'
  • About 1,360 LF storm (4"–36" PVC & HP)
  • 58 LF trench drain
  • 8 storm manholes
  • 6 curb inlets
  • 2 hydrodynamic separators
  • Outfall
  • About 14,600 CF underground detention system
  • 215 LF 6" PVC sanitary with sampling manhole
  • 244 LF 2" CTS water
  • SWPPP
  • MSD permits

Key quantities

  • About 1,360 LF storm
  • 8 manholes
  • 6 curb inlets
  • 2 hydrodynamic separators
  • About 14,600 CF underground detention

Services used