In Chesterfield, MO
Chesterfield Levee & Trail Improvements
Kuesel widened the levee about 10 feet, raised it with fill and graded the Phase 6 levee trail. The record does not document hydrovac work.
View project →Chesterfield Valley's retail and commercial strips carry dense utilities, and high groundwater behind the levee can make open digging unstable. Hydrovac exposes lines with small, controlled holes after Missouri One Call marks them. Both the mixed-use development and the Chesterfield Phase 6 levee trail are Kuesel projects in Chesterfield.
Local context: Exposing lines on high-groundwater Valley sites is cleaner with vacuum excavation than with a bucket.
Get a Chesterfield Bid
Chesterfield: Kuesel widened the levee about 10 feet, raised it with fill and graded the Phase 6 levee trail. The record does not document hydrovac work.
In Chesterfield, MO
Kuesel widened the levee about 10 feet, raised it with fill and graded the Phase 6 levee trail. The record does not document hydrovac work.
View project →
In Chesterfield, MO
Kuesel built the mixed-use site's mass excavation, custom wet utility runs and lake. The record does not document hydrovac work.
View project →Near Chesterfield — Town and Country, MO
New athletic-field parking lot at a private school in Town and Country: old structures abandoned, lot graded to ±0.10', 372 LF of storm and a 219 CY bio-retention cell. The record does not document hydrovac work.
View project →Near Chesterfield — Maryland Heights, MO
Kuesel hydro-excavated existing utilities before digging for the lab addition, so removals and grading proceeded with the lines exposed.
View project →Chesterfield Valley is bottomland protected by the Chesterfield levee. Sites there deal with high groundwater and soft alluvial soils, and fill placement has to be controlled to the geotechnical spec.
All Kuesel services in Chesterfield →