# St. Louis City Sewer & Water Line Contractor | Kuesel

> Water, storm, and sanitary sewer installation in the City of St. Louis, with MSD inspections and tie-ins threaded around crowded urban utilities.

Canonical: https://kueselinc.com/services/water-sewer/st-louis-mo

MSD is the sewer district for the City of St. Louis, so storm and sanitary work here runs through its inspections. Downtown tie-ins also mean traffic control and old, crowded crossings. Corporate headquarters sitework included underground utilities.

Utility tie-ins in the city land next to aging mains and services, so we verify every crossing before trenching.

## FAQ

**Whose standards govern sewer work in the City of St. Louis?**

MSD is the sewer district for the city. We read the approved plans for the inspection and testing steps before we price the job.

## Kuesel projects in and near St. Louis

St. Louis: The infill site received 871 LF of storm, bio-retention, sanitary sewer and a new 6-inch water tap with street repair under MSD permits.

- [Urban Infill Multifamily — In St. Louis, MO](https://kueselinc.com/projects/st-louis-city-multifamily-infill) - The infill site received 871 LF of storm, bio-retention, sanitary sewer and a new 6-inch water tap with street repair under MSD permits.
- [Food Plant Site Redevelopment — In St. Louis, MO](https://kueselinc.com/projects/st-louis-food-plant-site-redevelopment) - Kuesel replaced the old drainage with 80 LF of storm and a hydrodynamic separator for MSD water-quality requirements on a tighter footprint.
- [Institutional Building Basement & Utilities — In St. Louis, MO](https://kueselinc.com/projects/st-louis-institutional-basement-excavation-utilities) - The building received about 420 LF of storm, underground detention, sanitary and a 6-inch water tap with fire service and street repair under MSD permits.
- [Industrial Campus Sanitary Replacement — In St. Louis, MO](https://kueselinc.com/projects/st-louis-industrial-sanitary-sewer-replacement) - A failed 15-inch sanitary main was replaced with SDR 26 and a 6-inch lateral repaired, followed by 10-inch concrete street restoration under traffic control.

## Local facts

|  |  |
| --- | --- |
| City | St. Louis, MO |
| County | St. Louis (independent city) |
| From O'Fallon HQ | About 30 miles east (straight line) |
| Sewer district | Metropolitan St. Louis Sewer District (MSD) |

## Capabilities

- Water line installation
- Sanitary sewer mains & services
- Storm sewer pipe & structures
- Manholes & catch basins
- Detention & retention basins
- Lift stations
- Erosion & sediment control

## Contact

|  |  |
| --- | --- |
| Phone | (636) 978-3478 |
| Address | 854 Lone Star Drive, O'Fallon, MO 63366 |
| Office hours | Monday–Friday 7:00 AM–4:00 PM |
| Service area | the St. Louis region |
| Bids | We confirm whether we're bidding within 1 business day. |

## Related

- [Water & Sewer Infrastructure](https://kueselinc.com/services/water-sewer)
- [St. Louis, MO](https://kueselinc.com/locations/st-louis-mo)
- [Request a bid](https://kueselinc.com/contact)
- [Request a bid](https://kueselinc.com/bid-invite)
- [Services](https://kueselinc.com/services)
- [Projects](https://kueselinc.com/projects)
