# Hazelwood, MO Industrial Sewer & Water Work | Kuesel

> Storm, sanitary, and water work on North County industrial and logistics sites in Hazelwood near the airport, with MSD inspections and old-line locates.

Canonical: https://kueselinc.com/services/water-sewer/hazelwood-mo

MSD is the sewer district listed for Hazelwood, and older North County industrial lots often have abandoned or undocumented lines in the way. We pothole those before trenching, then install and test the new service before backfill.

Hazelwood industrial sites tie new utilities into existing North County industrial lines.

## FAQ

**What do you do about abandoned lines on a Hazelwood site?**

We locate and expose them first, then remove or abandon them as the approved plans call for.

## Kuesel projects in and near Hazelwood

Berkeley provides nearby project evidence for Hazelwood, not a claim of work inside Hazelwood. Yard drainage included 2,554 LF of storm, 2,440 CY of bio-retention and rock outlet protection, with sanitary and water service also installed.

- [Commercial Equipment Yard — Near Hazelwood — Berkeley, MO](https://kueselinc.com/projects/berkeley-equipment-yard-site-development) - Yard drainage included 2,554 LF of storm, 2,440 CY of bio-retention and rock outlet protection, with sanitary and water service also installed.
- [Laboratory Building Addition — Near Hazelwood — Maryland Heights, MO](https://kueselinc.com/projects/maryland-heights-lab-building-addition) - After exposing existing utilities, Kuesel installed 105 LF of storm along with an inlet, yard drain and trench drain for the lab addition.
- [Private School Athletic Parking Lot — Near Hazelwood — Town and Country, MO](https://kueselinc.com/projects/town-and-country-school-parking-lot) - The school parking lot received 372 LF of storm and a 219 CY bio-retention cell, with existing manholes tapped or adjusted under MSD permits.
- [Retail Pavement Cement Stabilization — Near Hazelwood — Alton, IL](https://kueselinc.com/projects/alton-retail-cement-stabilization) - Kuesel stabilized 4,293 SY of retail pavement subgrade 12 inches deep with Portland cement at 7%, exported 250 CY and restored subgrade to ±0.10'. The record does not document water sewer work.

## Local facts

|  |  |
| --- | --- |
| City | Hazelwood, MO |
| County | St. Louis County |
| From O'Fallon HQ | About 18 miles east (straight line) |
| Sewer district | Metropolitan St. Louis Sewer District (MSD) |

## Capabilities

- Water line installation
- Sanitary sewer mains & services
- Storm sewer pipe & structures
- Manholes & catch basins
- Detention & retention basins
- Lift stations
- Erosion & sediment control

## Contact

|  |  |
| --- | --- |
| Phone | (636) 978-3478 |
| Address | 854 Lone Star Drive, O'Fallon, MO 63366 |
| Office hours | Monday–Friday 7:00 AM–4:00 PM |
| Service area | the St. Louis region |
| Bids | We confirm whether we're bidding within 1 business day. |

## Related

- [Water & Sewer Infrastructure](https://kueselinc.com/services/water-sewer)
- [Hazelwood, MO](https://kueselinc.com/locations/hazelwood-mo)
- [Request a bid](https://kueselinc.com/contact)
- [Request a bid](https://kueselinc.com/bid-invite)
- [Services](https://kueselinc.com/services)
- [Projects](https://kueselinc.com/projects)
