Kuesel performed full-scope heavy civil work on a tire plant expansion in Clarksville, Tennessee.

The 2.2 million square foot expansion required 536,700 CY of dirt to be moved.

Kuesel self-performed the site utilities and soil stabilization, including lime treatment of the industrial building pad.

This is Kuesel's largest project to date, and Kuesel has worked multiple phases at the Clarksville plant in Montgomery County. Phase II added 2.2 million SF of new production and support facilities on the campus, plus additions to the existing plant, rail spur additions and deep equipment pits. It doubled the plant's passenger and light-truck tire capacity and added truck and bus tire production.

|  |  |
| --- | --- |
| Location | Clarksville, TN |
| County | Montgomery County |
| Market | Industrial |
| Scope | Full scope heavy civil — mass earthmoving, site utilities, stabilization, paving |

## Challenge → approach

Phase II combined a huge earthwork balance with deep, precise excavation: tunnels and mixing, cooling-water and carbon unloading pits cut inside a building pad that also had to be lime-stabilized at three different depths and rates. Kuesel located existing utilities by hydro excavation and ran the work under a full SWPPP.

## Key quantities

- 2.2M SF Phase II expansion
- 536,700 CY of dirt moved
- 327,817 SY stabilization
- about 28,900 LF utilities

## Phase II

On Phase II, Kuesel cleared about 80 acres and moved 536,700 CY of dirt, including structural and deep pit excavation for tunnels and mixing, cooling-water and carbon unloading pits.

Crews lime-stabilized 327,817 SY under the building pad, pavements, rail spur and laydown yards using about 10,300 tons of lime, placed about 135,000 tons of aggregate base and surface, and installed about 28,900 LF of utilities.

- 80 acres cleared
- 536,700 CY of dirt moved (including structural and deep pit excavation)
- ~31,000 CY topsoil stripped/respread
- 327,817 SY lime stabilization (pad 16" @ 5%, pavements & rail 12" @ 4%, laydown 12" @ 3%) using ~10,300 tons of lime
- ~135,000 tons aggregate base & surface
- ~28,900 LF utilities
- 124 storm structures
- 23 hydrants
- 26 PIVs
- Hydro-ex locating
- Full SWPPP

## Related services

- [Site Utilities](https://kueselinc.com/services/site-utilities)
- [Earthwork & Site Grading](https://kueselinc.com/services/earthwork)
- [Water & Sewer](https://kueselinc.com/services/water-sewer)
- [Soil Stabilization](https://kueselinc.com/services/soil-stabilization)
- [Industrial & Mission Critical Sitework](https://kueselinc.com/services/mission-critical)
- [Hydrovac Excavation](https://kueselinc.com/services/hydrovac)
- [Site Demolition](https://kueselinc.com/services/demolition)

## Related

- [All projects](https://kueselinc.com/projects)
- [Request a bid](https://kueselinc.com/contact)