# 28 Kuesel Site Work Projects in MO & IL (2026)

> 28 Kuesel site work projects across 14 markets in Missouri and Illinois, with location, scope and services for each.

Canonical: https://kueselinc.com/projects
Last updated: 2026-11-16

## By the numbers (a sample of recent projects)

Across 20 recent Kuesel projects: more than 750,000 CY of earth moved, more than 330,000 SY of soil stabilization, more than 11 miles of storm, sanitary and water pipe, more than 370 drainage and sewer structures, and 33 fire hydrants. These figures are from a sample of 20 recent projects, not lifetime totals.

- Earth moved: 750,000+ CY
- Soil stabilization: 330,000+ SY
- Storm, sanitary & water pipe: 11+ miles
- Drainage & sewer structures: 370+
- Fire hydrants: 33

## Industrial & Manufacturing

- [Clarksville Tire Plant Expansion — Clarksville, TN](https://kueselinc.com/projects/clarksville-tire-plant) - 2.2M SF Phase II expansion — 536,700 CY of dirt moved, with self-performed utilities and stabilization.
- [Food Plant Building Addition — St. Peters, MO](https://kueselinc.com/projects/st-peters-food-plant-building-addition) - Site work for a building addition at an operating food processing plant in St. Peters: slab subgrade remediated 2' deep with crushed stone, plus new storm and French drain.
- [Food Plant Site Redevelopment — St. Louis, MO](https://kueselinc.com/projects/st-louis-food-plant-site-redevelopment) - Site redevelopment at a City of St. Louis food manufacturing facility: old pavement, stairs and storm system removed, regraded with import, and a hydrodynamic separator for MSD water quality.
- [Commercial Equipment Yard — Berkeley, MO](https://kueselinc.com/projects/berkeley-equipment-yard-site-development) - Equipment yard and building in Berkeley: subgrade stabilized with 10" of Portland cement under a millings surface, more than 2,500 LF of storm and 2,440 CY of bio-retention.
- [Industrial Yard Improvements — O'Fallon, MO](https://kueselinc.com/projects/ofallon-industrial-yard-improvements) - Yard improvements at an operating construction-products facility in O'Fallon: regraded yard, crushed limestone surface over geotextile, new storm and erosion control.
- [Industrial Campus Sanitary Replacement — St. Louis, MO](https://kueselinc.com/projects/st-louis-industrial-sanitary-sewer-replacement) - Failed 15" sanitary main replaced with SDR 26 on an active industrial campus in the City of St. Louis, with a lateral repair and concrete street restoration under traffic control.

## Data Center & Tech

- [Data Center Site Development — St. Louis County, MO](https://kueselinc.com/projects/st-louis-data-center-site-development) - Full site development for a data center campus: mass grading, more than 3,600 LF of storm with three bio-retention ponds, 30" PE sanitary sewer and an 8" C900 water main.
- [Technology Campus Sitework — St. Louis Metro, MO](https://kueselinc.com/projects/st-louis-metro-technology-campus) - Self-performed earthwork and utilities for a technology campus — a fast-track tech campus build delivered without a hiccup.

## Logistics

- [Freight Terminal Expansion — Fenton, MO](https://kueselinc.com/projects/fenton-freight-terminal-expansion) - Complete site package for a freight terminal building addition in Fenton: a structural-fill pad, more than 2,400 LF of storm sewer, two underground detention systems and a new water main.
- [Logistics Sitework — St. Peters, MO](https://kueselinc.com/projects/st-peters-logistics-sitework) - Industrial logistics pad — mass earthwork, grading, and wet utilities on a greenfield site.

## Multifamily

- [Multi-Building Residential Development — Troy, MO](https://kueselinc.com/projects/troy-multifamily-site-development) - Site development for a multi-building residential community in Troy: mass grading, more than 2,500 LF of storm sewer, a sanitary system with eight manholes and about 1,500 LF of water main.
- [Urban Infill Multifamily — St. Louis, MO](https://kueselinc.com/projects/st-louis-city-multifamily-infill) - Urban infill in the City of St. Louis: houses and foundations demolished, about 4,000 CY exported, and new storm, bio-retention, sanitary and a 6" water tap, permitted through MSD.
- [Build-to-Rent Sanitary Main — Wentzville, MO](https://kueselinc.com/projects/wentzville-build-to-rent-sanitary-main) - Sanitary main for a build-to-rent single-family community in Wentzville: about 1,700 LF of 12" PVC upsized from 10", with a 526 LF segment lowered and converted to C900.
- [Mixed-Use Development & Lake — Chesterfield, MO](https://kueselinc.com/projects/chesterfield-mixed-use-sitework) - Sitework for a lakeside mixed-use community — custom utility runs, lake construction, and finish grade developers brag about.

## Commercial & Retail

- [Convenience Store & Fuel Station — Crestwood, MO](https://kueselinc.com/projects/crestwood-convenience-store-site-development) - Site development for a new convenience store and fuel station in Crestwood: about 1,300 LF of storm, two hydrodynamic separators and a roughly 14,000 CF underground detention system.
- [Retail Pavement Cement Stabilization — Alton, IL](https://kueselinc.com/projects/alton-retail-cement-stabilization) - About 4,300 SY of pavement subgrade stabilized 12" deep with Portland cement at 7% at a national retail store in Alton, so paving followed without undercut.
- [Retail Store Fire Main Repair — St. Peters, MO](https://kueselinc.com/projects/st-peters-retail-fire-main-repair) - Fire main repair at a big-box retail store in St. Peters: 10" ductile iron replaced and reconnected, with the concrete floor and sidewalk removed and restored.
- [Commercial Stormwater Retrofit — St. Louis County, MO](https://kueselinc.com/projects/st-louis-county-bioretention-retrofit) - Stormwater retrofit on an existing commercial site: asphalt removed, an 840 SF bio-retention basin built to MSD standard detail, and a new storm outfall.
- [Laboratory Building Addition — Maryland Heights, MO](https://kueselinc.com/projects/maryland-heights-lab-building-addition) - Site prep for a lab building addition in Maryland Heights: existing utilities located by hydro excavation before digging, then removals, grading, subgrade and new storm.
- [Corporate Headquarters Sitework — St. Louis, MO](https://kueselinc.com/projects/st-louis-corporate-campus-sitework) - Corporate campus sitework — full excavation, mass grading, and underground utilities delivered on a tight downtown schedule.

## Education & Institutional

- [Institutional Building Basement & Utilities — St. Louis, MO](https://kueselinc.com/projects/st-louis-institutional-basement-excavation-utilities) - Basement excavation and site utilities for a new institutional building in south St. Louis City, with hydro excavation near existing lines and an underground detention system.
- [Middle School Storm & Bio-Retention Rebuild — St. Louis County, MO](https://kueselinc.com/projects/st-louis-county-middle-school-storm-bioretention) - Campus improvements at a public middle school in south St. Louis County: garage and canopy demolished, the old storm system replaced with about 1,000 LF of PE pipe, and a rebuilt bio-retention basin.
- [Private School Athletic Parking Lot — Town and Country, MO](https://kueselinc.com/projects/town-and-country-school-parking-lot) - New athletic-field parking lot at a private school in Town and Country: old structures abandoned, lot graded to ±0.10', 372 LF of storm and a 219 CY bio-retention cell.
- [University Track & Soccer Upgrade — Columbia, MO](https://kueselinc.com/projects/columbia-athletics-soil-stabilization) - Union-labor soil stabilization to a 12-inch depth for a university track and soccer upgrade in Columbia.

## Public Infrastructure

- [Interstate Utility Relocations — Columbia, MO](https://kueselinc.com/projects/columbia-interstate-utility-relocations) - Sanitary and water relocations for an interstate widening in Columbia: utilities hydro-excavated first, 745 LF of 8" sanitary relocated, and about 400 LF of water main moved with a live tie-in.
- [Chesterfield Levee & Trail Improvements — Chesterfield, MO](https://kueselinc.com/projects/chesterfield-levee-trail-improvements) - Levee improvements in Chesterfield — widening the levee about 10 feet, raising it with fill, and grading the Phase 6 levee trail.
- [Public-Safety Headquarters Sitework — St. Charles County, MO](https://kueselinc.com/projects/st-charles-county-public-safety-sitework) - Headquarters facility on a public-safety campus — excavation, grading, and utility installation on a public-safety campus.
- [Park, Trails & Playground — Foristell, MO](https://kueselinc.com/projects/foristell-park-sitework) - A three-time award-winning park offering shelters, paved and natural surface multi-use trails for hiking and biking, and a destination playground.

## Related

- [Request a bid](https://kueselinc.com/contact)
- [Request a bid](https://kueselinc.com/bid-invite)
- [Services](https://kueselinc.com/services)
- [Projects](https://kueselinc.com/projects)