# Excavating & Site Work in Chesterfield, MO | Kuesel

> Earthwork, building pads and storm and sanitary utilities in Chesterfield, MO. Kuesel knows City grading permits, MSD review and Valley soils. Request a bid.

Canonical: https://kueselinc.com/locations/chesterfield-mo
Last updated: 2026-11-19

Chesterfield has two very different kinds of sites. Down in Chesterfield Valley you're on levee-protected Missouri River bottomland, with high groundwater and fill over alluvium. Up in the hills south of I-64 you get loess and cherty clay slopes cut by creeks. Kuesel self-performs the site package for both: removals, mass and fine grading, building pads, soil stabilization, and storm, sanitary and water utilities. We work for developers, general contractors, civil engineers, facility owners and public agencies, out of our headquarters in O'Fallon.

## Sitework in Chesterfield Valley and the Chesterfield uplands

The Valley is about 4,700 acres of mostly commercial and industrial land behind a 12-mile levee system on the Missouri River. Inside it are Spirit of St. Louis Airport, I-64/US 40, rail lines and large retail and industrial sites ([USACE National Levee Database](https://levees.sec.usace.army.mil/levees/5605050001)). Valley sites usually come down to fill, compaction and groundwater. Upland sites come down to slopes, tree preservation and the creek buffers along Bonhomme, Caulks and Creve Coeur Creeks (see permits below).

We sequence earthwork and utilities so the building contractor can get on the pad early. Storm and detention go in first, so erosion control keeps working while parking and drives are still being graded.

## Kuesel projects in and near Chesterfield

All four are published Kuesel projects. The two in-city projects are described qualitatively from the project pages. Quantities on the two nearby projects come from those project pages. Client, owner and agency names are left off on purpose.

| Project | Year | Scope | Key quantities |
| --- | --- | --- | --- |
| [Levee and Phase 6 trail improvements](https://kueselinc.com/projects/chesterfield-levee-trail-improvements), Chesterfield | Not published | Public levee work: levee raise and widening with fill, trail grading | Levee widened about 10 ft; levee raised with added fill; Phase 6 levee trail grading |
| [Mixed-use development and lake](https://kueselinc.com/projects/chesterfield-mixed-use-sitework), Chesterfield | Not published | Private development: mass excavation, custom wet utility runs, lake construction | Qualitative only; quantities not published on the project page |
| [Private school athletic parking lot](https://kueselinc.com/projects/town-and-country-school-parking-lot), Town and Country (near) | 2026 | Removals, structure abandonment, grading, subgrade, storm and bio-retention under MSD permits | 372 LF 12" PVC storm; 219 CY bio-retention cell; pavement and sidewalk subgrade to ±0.10'; 1 storm manhole, 2 two-grate inlets, 1 area inlet, 1 outfall structure; 2 manholes adjusted |
| [Laboratory building addition](https://kueselinc.com/projects/maryland-heights-lab-building-addition), Maryland Heights (near) | 2025 | Hydro excavation to locate utilities, removals, grading, addition subgrade, storm | 105 LF storm; 1 trench drain; inlet and yard drain |

**Levee and Phase 6 trail improvements.** On public levee work in Chesterfield, Kuesel widened the levee about 10 feet and raised it with added fill. The levee trail grading was folded into the levee drawings, and Kuesel also completed the Phase 6 levee trail improvements. Levee fill is placed and compacted to the project's geotechnical specification, with testing by the owner's testing agency.

**Mixed-use development and lake.** For a lakeside mixed-use community in Chesterfield, Kuesel did the mass excavation, built custom wet utility runs and constructed the lake.

**Nearby: private school athletic parking lot, Town and Country (2026).** The new lot sat on top of old storm and sanitary structures on an occupied campus. We abandoned what was no longer needed, tapped and adjusted what stayed, built the subgrade to ±0.10', and added a 219 CY bio-retention cell so the lot met MSD stormwater requirements.

**Nearby: laboratory building addition, Maryland Heights (2025).** Before any digging at an operating life sciences facility, we used hydro excavation to expose the existing utilities. Then we removed pavement, curb, a trash enclosure and bollards, graded, built the addition's subgrade, and installed 105 LF of storm, an inlet, a yard drain and a trench drain.

## Permits a Chesterfield site needs before the first load moves

Chesterfield splits the work. The City handles zoning, site plans, grading and right-of-way. St. Louis County issues and inspects building permits. MSD reviews sewer and stormwater. Here is what to plan for:

- **Municipal Zoning Approval first.** The City contracts with St. Louis County Transportation and Public Works for building permits and inspections, but City zoning approval has to come before the County will issue a permit ([City of Chesterfield, Municipal Zoning Approval](https://content.civicplus.com/api/assets/8362cab0-1616-4758-ae19-5dfb985ace0b)).
- **City grading permit (City Code §405.04.110).** It's required when the total disturbed area from clearing, excavation or fill is 5,000 SF or more. The Planning Commission or Planning Department has to approve a Site Development Plan (or Concept or Section Plan) before the grading permit is issued, with one Valley exception: a grading permit can be issued in Chesterfield Valley strictly for stockpiling or surcharging a future building pad. The permit is issued after plans are approved, sureties are posted, outside-agency approvals are in, and easements are recorded. It generally expires after one year ([City of Chesterfield, Grading Permit Information, rev. 06/2026](https://content.civicplus.com/api/assets/mo-chesterfield/89629c83-5f06-45ea-838e-8114ea4918af); [Sediment and Erosion Control](https://content.civicplus.com/api/assets/5d75df15-141b-4629-b6bb-b75ae88f3a83)).
- **SWPPP inspections.** Active grading sites have to submit a SWPPP Special Inspector's Report to the City weekly and after every rain of ¼ inch or more. A St. Louis County Land Disturbance Special Inspector must prepare it. City Engineering also inspects until the site is stabilized with vegetation ([Grading Permit Information](https://content.civicplus.com/api/assets/mo-chesterfield/89629c83-5f06-45ea-838e-8114ea4918af); [St. Louis County Land Disturbance](https://stlouiscountymo.gov/st-louis-county-departments/transportation-and-public-works/land-disturbance/)).
- **Creek buffers.** No clearing, grading or disturbance of any kind within 50 feet of the top of bank of Bonhomme, Caulks or Creve Coeur Creek, or within 25 feet of other natural watercourses on the current USGS map (City Code §405.04.110(M), per [Grading Permit Information](https://content.civicplus.com/api/assets/mo-chesterfield/89629c83-5f06-45ea-838e-8114ea4918af)).
- **Bonds you may see on the grading permit.** A performance guarantee is required. A tree preservation bond, a downstream impoundment bond (with a sealed pre-construction lake survey) when a lake, pond or detention area could be affected, and a pavement preservation bond for haul routes may also be required ([Grading Permit Information](https://content.civicplus.com/api/assets/mo-chesterfield/89629c83-5f06-45ea-838e-8114ea4918af)).
- **Right-of-way.** Any physical disturbance of public right-of-way (mains, sewers, drains, driveways, sidewalks) needs a City Special Use Permit. The applicant must be a Registered Right-of-Way User, and a MUTCD traffic control plan is required if driving lanes are affected ([City of Chesterfield, Special Use Permit Instructions, 2026 draft](https://content.civicplus.com/api/assets/mo-chesterfield/fee1f389-5b7d-4d9a-bbf1-28e485087436)).
- **MSD.** Storm and sanitary plans are reviewed by MSD. Plans first submitted to MSD on or after January 1, 2027 fall under MSD's 2027 rules ([MSD Rules and Engineering Design Requirements](https://msdprojectclear.org/doing-business/development-review/rules-regulations-design-requirements/); see our guide to [MSD's 2027 rules](https://kueselinc.com/guides/msd-2027-rules)).
- **State land disturbance permit.** Missouri DNR requires a land disturbance permit with a site-specific SWPPP when a project disturbs 1 acre or more, or is part of a larger common plan that does ([Missouri DNR](https://dnr.mo.gov/water/business-industry-other-entities/permits-certification-engineering-fees/stormwater/construction-land-disturbance)).
- **Locates.** Call Missouri 811 before digging. Where private lines or crowded corridors make locates uncertain, Kuesel can [daylight utilities with hydrovac](https://kueselinc.com/services/hydrovac) first, as we did on the Maryland Heights lab addition.

Kuesel's preconstruction team checks grading-plan quantities, haul routes and erosion-control phasing against the permit set before we price. We don't claim to hold the City grading permit; that sits with the owner or developer.

## Chesterfield utilities: who owns the water, sewer and storm

The City of Chesterfield doesn't provide utility services itself ([City of Chesterfield, Utility and Agency Contacts, July 2025](https://content.civicplus.com/api/assets/c633a753-2675-4c96-b34c-d9ea6dd436f2?scope=all)).

- **Water.** Missouri American Water. We confirm main locations, tap and meter requirements with the water company for each parcel at bid.
- **Sanitary sewer.** MSD.
- **Storm sewer.** MSD. In the Valley, the City also lists the levee district under storm sewer, so interior drainage tied to the levee system may involve the levee district as well as MSD (same City source).
- **Gas and electric.** Spire and Ameren Missouri (same City source). Dry-utility relocations are coordinated with those owners.

Kuesel self-performs [storm sewer](https://kueselinc.com/services/storm-sewer), [sanitary sewer](https://kueselinc.com/services/sanitary-sewer) and [water main installation](https://kueselinc.com/services/water-main-installation), so one crew carries the utilities from the building pad to the tie-in.

## Chesterfield Valley soils, the levee and groundwater

- **The levee.** The Valley levee was breached in the 1993 flood. It has since been improved to reduce risk from a 500-year (0.2% annual chance) Missouri River flood, and FEMA lists it as an accredited levee system ([USACE National Levee Database](https://levees.sec.usace.army.mil/levees/5605050001)). The federal plan raised about 11.5 miles of levee along the Missouri River and Bonhomme Creek, with seepage control that included relief wells, a sheet pile cutoff and seepage berms 150 to 300 feet wide (USACE Chief's Report).
- **Valley soils.** Missouri Geological Survey mapping of the Chesterfield quadrangle shows floodplain alluvium more than 6 feet thick: mostly sandy over loamy and silty deposits, with some poorly drained clayey abandoned-channel areas. Much of the developed Valley is mapped as "urban land, fill on alluvium," where fill has variable layers of compaction ([MGS Surficial Material Geologic Map, Chesterfield 7.5' Quadrangle](https://info.mo.gov/dnr/DNR_GIS/geology/mapindex/OFM-10-0553-GS.pdf)). Old fill and soft alluvium are why proof rolls fail and pads settle.
- **Upland soils.** The same map shows Peoria loess (fine silty soils) on ridges, and cherty clayey colluvium and residuum on the steep slopes of the Caulks Creek watershed. Some developed upland areas sit on karst limestone (same MGS source).
- **Groundwater.** Undercutting soft Valley subgrade can reach groundwater before it reaches firm material. On sites we're already working, when weather leaves an in-place subgrade too wet to pass proof roll, Kuesel can dry or stabilize it in place with quicklime or cement, spread dust-free from our state-of-the-art spreader trucks. See [soil stabilization in Chesterfield](https://kueselinc.com/services/soil-stabilization/chesterfield-mo) and [lime vs. cement vs. undercut](https://kueselinc.com/guides/lime-vs-cement-vs-undercut). We plan groundwater control for Valley utility work before we dig.
- **Surcharge pads.** Where the geotechnical engineer calls for surcharging a Valley building pad, the City's Valley exception lets a grading permit be issued for stockpiling or surcharge before site plan approval. We place and compact fill in the lifts and moisture range the geotechnical engineer specifies, with testing by the owner's testing agency.

Always design to the project geotechnical report. The general conditions above don't replace it.

## What Kuesel self-performs in Chesterfield

- [Earthwork and site grading](https://kueselinc.com/services/earthwork/chesterfield-mo): mass cut and fill, building pads, controlled fill, GPS machine control
- [Commercial site work](https://kueselinc.com/services/commercial-site-work) and [site utilities](https://kueselinc.com/services/water-sewer/chesterfield-mo)
- [Soil stabilization](https://kueselinc.com/services/soil-stabilization/chesterfield-mo) (quicklime and cement)
- [Bioretention basins](https://kueselinc.com/bioretention-basins) and MSD stormwater BMPs
- [Site demolition](https://kueselinc.com/services/demolition): pavement, curb and structure removals at operating facilities
- [Hydrovac excavation](https://kueselinc.com/services/hydrovac/chesterfield-mo) for locating and daylighting
- [Industrial and mission critical sitework](https://kueselinc.com/services/mission-critical/chesterfield-mo)
- [Preconstruction](https://kueselinc.com/services/preconstruction): AGTEK 2D cut/fill takeoffs and 3D earthwork models

Commercial plumbing inside the building line comes from our sister company [Legacy Plumbing](https://legacyplumbingmo.com/locations/chesterfield).

## Chesterfield local facts

|  |  |
| --- | --- |
| City | Chesterfield, MO |
| County | St. Louis County |
| Main corridors | I-64/US 40, Missouri River (Valley) |
| Chesterfield Valley | About 4,700 acres behind a 12-mile levee system, improved to reduce risk from a 500-year flood; FEMA-accredited ([USACE](https://levees.sec.usace.army.mil/levees/5605050001)) |
| Airport in the Valley | Spirit of St. Louis Airport |
| Zoning approval | City of Chesterfield (Municipal Zoning Approval) |
| Building permits and inspections | St. Louis County Transportation and Public Works, under contract to the City |
| Grading permit | City of Chesterfield, 5,000 SF or more disturbed (§405.04.110) |
| Creek buffers | 50 ft from Bonhomme, Caulks and Creve Coeur Creeks; 25 ft from other natural watercourses |
| Water | Missouri American Water |
| Sanitary and storm | MSD (levee district also listed for storm in the Valley) |
| MSD district? | Yes |
| State permit | MoDNR land disturbance permit at 1+ acre |
| Kuesel headquarters | O'Fallon, MO |

## FAQ

### Do I need a grading permit in Chesterfield, MO?

Yes, when clearing, excavation or fill disturbs 5,000 square feet or more. In most cases the City has to approve a Site Development Plan first. Active sites file weekly SWPPP special-inspector reports, plus a report after every rain of ¼ inch or more. Projects that disturb 1 acre or more also need a Missouri DNR land disturbance permit.

### Who issues building permits in Chesterfield?

St. Louis County Transportation and Public Works, under contract with the City. You need the City's Municipal Zoning Approval first. Grading and right-of-way permits come from the City.

### Is Chesterfield in the MSD district?

Yes. MSD provides sanitary and storm sewer service and reviews sewer and stormwater plans. Plans first submitted on or after January 1, 2027 fall under MSD's 2027 rules.

### Can a Chesterfield Valley building pad be surcharged before site plan approval?

The City can issue a grading permit in Chesterfield Valley strictly for stockpiling or surcharging a future building pad. Kuesel places and compacts surcharge and pad fill to the lifts and moisture range in the geotechnical specification.

### What has Kuesel built in and near Chesterfield?

In Chesterfield: public levee and Phase 6 trail improvements (levee widened about 10 feet and raised with fill), and the mass excavation, wet utilities and lake for a mixed-use development. Nearby: a 2026 school parking lot in Town and Country (372 LF of storm, 219 CY bio-retention) and a 2025 lab building addition in Maryland Heights (hydro excavation, 105 LF of storm, trench drain).

### What do you do when a Chesterfield Valley subgrade is too wet?

Undercutting in the Valley can hit groundwater before firm material. On sites we're already working, we usually dry or stabilize the in-place subgrade with quicklime or cement, spread dust-free from our spreader trucks, and we price undercut as the alternative.

### Can you work near Chesterfield's creeks?

Yes, within the City's buffers. Grading isn't allowed within 50 feet of the top of bank of Bonhomme, Caulks or Creve Coeur Creek, or within 25 feet of other natural watercourses. We follow the permit's stream buffer requirements.

### How do I get Kuesel to bid a Chesterfield project?

Send the ITB or scope, plans and specs, the geotechnical report, the site address and the bid date through [Request a Bid](https://kueselinc.com/contact) or [Invite Us to Bid](https://kueselinc.com/bid-invite). We confirm whether we're bidding within 1 business day. Office hours are Monday–Friday, 7:00 AM–4:00 PM.

## Request a bid

**Bidding a Chesterfield site?** Send the plans, geotechnical report and bid date. [Request a Bid](https://kueselinc.com/contact) · [Invite Us to Bid](https://kueselinc.com/bid-invite)
Office hours: Monday–Friday, 7:00 AM–4:00 PM.

## Contact

|  |  |
| --- | --- |
| Phone | (636) 978-3478 |
| Address | 854 Lone Star Drive, O'Fallon, MO 63366 |
| Office hours | Monday–Friday 7:00 AM–4:00 PM |
| Service area | the St. Louis region |
| Bids | We confirm whether we're bidding within 1 business day. |

## Related

- [Service area](https://kueselinc.com/service-area)
- [Request a bid](https://kueselinc.com/contact)
- [Request a bid](https://kueselinc.com/bid-invite)
- [Services](https://kueselinc.com/services)
- [Projects](https://kueselinc.com/projects)
